Question

The utilization of sensor data to detect deteriorating machine parts prior to product failure is an...

The utilization of sensor data to detect deteriorating machine parts prior to product failure is an example of which operations management application?

Logistics

Product design and development

Preventive maintenance

Inventory management

0 0
Add a comment Improve this question Transcribed image text
Answer #1

1. C. Preventive maintenance

We can say that lack of preventive maintenance in this case is what causes the factors leading to product failure.

Add a comment
Know the answer?
Add Answer to:
The utilization of sensor data to detect deteriorating machine parts prior to product failure is an...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 1.Which of the following manufacturing strategies relies mostly on forecasted demand?        a.Engineer-to-Order       ...

    1.Which of the following manufacturing strategies relies mostly on forecasted demand?        a.Engineer-to-Order        b.Make-to-Order        c.Assemble-to-Order        d.Make-to-Plan 2.Sam's Logistics has been asked to perform the last stage of a production process by Hackory Farms: putting together final gift box assortments of sausage, cheese, and crackers. Which of the following manufacturing strategies best describes this scenario of "form postponement"?        a.Engineer-to-Order        b.Make-to-Order        c.Assemble-to-Order        d.Make-to-Plan 3.Which of the following...

  • Case Study: Auto-Parts Warehouse Management System Jack Greig and Daniel Cox have several years of experience...

    Case Study: Auto-Parts Warehouse Management System Jack Greig and Daniel Cox have several years of experience of running an auto-parts business as a supplier in a major city of Australia. The current warehouse management system is not able to handle highly dynamic procedures that can help them move and store inventory at peak efficiency and lowest cost. Jack and Daniel have decided to develop a new Auto-Parts Warehouse Management System where its functionality can be applied throughout all core warehouse...

  • Really Appreciate the help :) Organisational data is not always useful. It becomes more useful for...

    Really Appreciate the help :) Organisational data is not always useful. It becomes more useful for organisations when it is processed by organisational information systems and applications. a. False b. True Which one is an example of a prototype? a. A primary version of the software with fewer functions b. A mock website created by a graphical software c. Different pages of a website drawn on a piece of paper d. All other choices Which one is an example of...

  • what are the four parts of a proper engineering specification? see table 2.4 as an example....

    what are the four parts of a proper engineering specification? see table 2.4 as an example. Describe what information conveyed with each part. Table 2.4: Product design specification for the compressor transmission. Criteria Test conditions Objective Aspect Test transmission on a Transmission must transmit 5 kW Transmit Performance at 2850 rpm. dynamometer torque If positive drive is employed then assume specified ratio or if a positive drive is used measure speed of output shaft at design Speed ratio The transmission...

  • ACCOUNTING Format for excel assignment : CURRECTED: ABC ORIGINAL PROBLEM DATA (W Excel File): CHECK FIGURES:...

    ACCOUNTING Format for excel assignment : CURRECTED: ABC ORIGINAL PROBLEM DATA (W Excel File): CHECK FIGURES: AX40 Traditional Unit Cost: $62.75 EX90 ABC Unit Cost: $116.80 For several years, Adria Manufacturing has produced a single product called AX40. Then two years ago, the company automated a portion of its plant and at the same time introduced a second product called EX90 which has become increasingly popular. The EX90 is a more complex product, requiring one hour of direct labor time...

  • Case 15.2    Glaser Machine Works Glaser Machine Works has experienced a significant change in its business...

    Case 15.2    Glaser Machine Works Glaser Machine Works has experienced a significant change in its business operations over the past 50 years. Glaser started business as a machine shop that produced specialty tools and products for the timber and lumber industry. This was a logical fit, given its location in the southern part of the United States. However, over the years, Glaser looked to expand its offerings beyond the lumber and timber industry. Initially, its small size coupled with its...

  • CASE Parts Emporium Parts Emporium, Inc., is a wholesale distributor of automobile parts formed is on...

    CASE Parts Emporium Parts Emporium, Inc., is a wholesale distributor of automobile parts formed is on hand, the firm's customer service is inadequate. Parts Emporium tries to by two disenchanted auto mechanics, Dan Block and Ed Spriggs. Originally backorder the customer orders not immediately filled from stock, but some 10 located in Block's garage, the firm showed slow but steady growth for percent of demand is being lost to competing distributorships. Because stock 7 years before it relocated to an...

  • CORRECTED: ABC ORIGINAL PROBLEM DATA (18I Excel File: CHECK FIGURES: AX40 Traditional Unit Cost: $62.75 EX90...

    CORRECTED: ABC ORIGINAL PROBLEM DATA (18I Excel File: CHECK FIGURES: AX40 Traditional Unit Cost: $62.75 EX90 ABC Unit Cost: $116.80 For several years, Adria Manufacturing has produced a single product called AX40. Then two years ago, the company automated a portion of its plant and at the same time introduced a second product called EX90 which has become increasingly popular. The EX90 is a more complex product, requiring one hour of direct labor time per unit to manufacture and extensive...

  • How can we assess whether a project is a success or a failure? This case presents...

    How can we assess whether a project is a success or a failure? This case presents two phases of a large business transformation project involving the implementation of an ERP system with the aim of creating an integrated company. The case illustrates some of the challenges associated with integration. It also presents the obstacles facing companies that undertake projects involving large information technology projects. Bombardier and Its Environment Joseph-Armand Bombardier was 15 years old when he built his first snowmobile...

  • Foam Products, Inc., makes foam seat cushions for the automotive and aerospace industries. The company's activity-based...

    Foam Products, Inc., makes foam seat cushions for the automotive and aerospace industries. The company's activity-based costing system has four activity cost pools, which are listed below along with their activity measures and activity rates: Activity Cost Pool Supporting direct labor Batch processing Order processing Customer service Activity Measure Number of direct labor-hours Number of batches Number of orders Number of customers $ $ $ $ Activity Rate 14 per direct labor-hour 89 per batch 276 per order 2,610 per...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT