Question

Nationwide Auto Parts uses a periodic review inventory control system for one of its stock items....

Nationwide Auto Parts uses a periodic review inventory control system for one of its stock items. The review interval is 12 ​weeks, and the lead time for receiving the materials ordered from its wholesaler is 4 weeks. Weekly demand is normally​ distributed, with a mean of 125 units and a standard deviation of 25 units. Refer to the standard normal table LOADING... for​ z-values.

a. What is the average and the standard deviation of demand during the protection​ interval?

The average demand during the protection interval is ___ units. ​(Enter your response as an​ integer.)

0 0
Add a comment Improve this question Transcribed image text
Know the answer?
Add Answer to:
Nationwide Auto Parts uses a periodic review inventory control system for one of its stock items....
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • OM

    Nationwide Auto Parts uses a periodic review inventorycontrol system for one of its stock items. The review intervalis 6 weeks, and the lead time for receiving the materialsordered from its wholesaler is 3 weeks. Weekly demand isnormally distributed, with a mean of 100 units and a standarddeviation of 20 units.a. What is the average and the standard deviation ofdemand during the protection interval?b. What should be the target inventory level if the firmdesires 97.5 percent stockout protection?c. If 350 units...

  • Problem 14-35 (Algorithmic) Statewide Auto Parts uses a four-week periodic review system to reorder parts for...

    Problem 14-35 (Algorithmic) Statewide Auto Parts uses a four-week periodic review system to reorder parts for its inventory stock. A one-week lead time is required to fill the order. Demand for one particular part during the five-week replenishment period is normally distributed with a mean of 22 units and a standard deviation of 8 units. a. At a particular periodic review, 9 units are in inventory. The parts manager places an order for 17 units. What is the probability that...

  • In a Q ​system, the demand rate for strawberry ice cream is normally​ distributed, with an...

    In a Q ​system, the demand rate for strawberry ice cream is normally​ distributed, with an average of 305 pints per week. The lead time is 8 weeks. The standard deviation of weekly demand is 12 pints. Refer to the standard normal table LOADING... for​ z-values. a. The standard deviation of demand during the 8 ​-week lead time is 34 pints. b. The average demand during the 8 ​-week lead time is ___ pints. ​(Enter your response as an​ integer.)

  • HELP! PLEASE Petromax Enterprises uses a continuous review inventory control system for one of its SKUs....

    HELP! PLEASE Petromax Enterprises uses a continuous review inventory control system for one of its SKUs. The following information is available on the item. The firm operates 52 weeks in a year. Demand = 91,000units/year Ordering cost​ = $32.50 ​Holding cost​ = $3.50/unit/year Average lead time​ = 4 Weeks Standard deviation of weekly demand​ = 250 units a. The economic order quantity for this item is ____units. (Enter your response rounded to the nearest whole​ number.) b. If Petromax wants...

  • An item that is managed with a periodic review system has average daily demand of 60...

    An item that is managed with a periodic review system has average daily demand of 60 units with a standard deviation of 2. The order interval for this item has been set at 10 days. Lead time for this item averages 5 days, with a standard deviation of 0.5 days. Acceptable stockout risk has been established as 2.5%. At the latest count, there are 480 units in inventory. How many units should be ordered?

  • ​Sam's Cat Hotel operates 52 weeks per​ year and uses a continuous review inventory system. It...

    ​Sam's Cat Hotel operates 52 weeks per​ year and uses a continuous review inventory system. It purchases kitty litter for ​$10.75 per bag. The following information is available about these bags. Demand = 85 bags/week Order cost = $57/order Annual holding cost = 26% of cost per bag Desired cycle-service level = 90% Lead-time = 2 weeks Standard deviation of weekly demand = 18 bags What is the economic order quantity (EOQ) for kitty litter? What would be the average...

  • Jake, Inc. begins a review of ordering policies for its continuous review system by checking the...

    Jake, Inc. begins a review of ordering policies for its continuous review system by checking the current policies for a sample of its A items. Following are the characteristics of one item: Demand (D) = 94 units/week (assume 52 weeks per year) Ordering and setup cost (S) = $720/order Holding cost (H) = $23/unit/year Lead time (L) =3 weeks Standard deviation of weekly demand =30 units Cycle-service level =82 percent Develop the best policies for a periodic-review system. a. What...

  • In a continuous review system, the average daily demand for a part is Normally distributed with...

    In a continuous review system, the average daily demand for a part is Normally distributed with mean 20 and standard deviation of 4. The lead time to receive the part from the time it is ordered is 9 days. The appropriate re-order point for this part if we want a 95% service level is

  • Dave's Auto Supply custom mixes paint for its customers. The shop performs a weekly inventory count...

    Dave's Auto Supply custom mixes paint for its customers. The shop performs a weekly inventory count of the main colors that are used for mixing paint. Average weekly demand 26 gallons Standard deviation of demand 4 gallons/week Desired service probability 90 % Current inventory 28 gallons Lead time 1 week Determine the amount of white paint that should be ordered using the above information: (Use Excel's NORMSINV() function to find the correct critical value for the given α-level. Do not...

  • A company manages its inventory for a specific item using the periodic review inventory model with...

    A company manages its inventory for a specific item using the periodic review inventory model with 10 days between orders. It is currently time to place an order, and the company notes that there are 140 items on hand. The item to be replenished has a lead time of 6 days with a daily demand of 440 units. The standard deviation of demand during the uncertainty period has been calculated to be 65. If the company wants to have at...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT