Assume you are working in a plant as a chemical engineer. One of your tasks is to monitor pH of a specific process. Each day, you record the pH of the process at three different time of the day. The data for the past few days is presented in the following table. we know that standard deviation of the pH of the process is 0.1. Based on the collected data, construct two control charts that monitor the average and variability of the pH of the process. Is the average and variability of the process in control?
Day |
Recorded pH |
||
Monday |
8.35 |
8.04 |
8.26 |
Tuesday |
7.99 |
7.69 |
8.31 |
Wednesday |
7.68 |
7.60 |
7.69 |
Thursday |
7.85 |
7.81 |
8.21 |
Hi
Please download the Excel answer file by going to this link ...
https://drive.google.com/open?id=1XpAR3tQN3aCxcfU9YC2btK0IWOZbPa21
Thanks
Assume you are working in a plant as a chemical engineer. One of your tasks is...
Assume you are working in a plant as a chemical engineer. One of your tasks is to monitor pH of a specific process. Each day, you record the pH of the process at three different time of the day. The data for the past few days is presented in the following table. we know that standard deviation of the pH of the process is 0.1. Based on the collected data, construct two control charts that monitor the average and variability...