A regulated utility is going to add generating capacity to their system and file a rate case to recover the costs. The utility has the following initial conditions, prior to the rate case: • Rate Base has been established at $4.5Billion. Of this, 51% is debt at 5% interest and 49% is equity with a return of 11% • Sales are 9.8MMWhr • Operating Costs, excluding fuel are $800M. Fuel is handled as a separate rider. The utility proposes to add a combined cycle gas turbine with the following characteristics: • 702Mwe F-Class System; Heat Rate @ 6600 Btu/kw; CO2 @ 117lb/MMBtu • Overnight capital cost of $687M • Gas Pipeline overnight capital cost of $30M • Fixed O&M cost of $11/kw-yr • Variable O&M cost of $3.50/MWhr • Fuel costs are $25/MWhr • The assumed capacity factor is 87% • All added capital and operating costs are proposed to be recovered in rates Assume all dollars are in the test year; no inflation adjustment. Using the simplified formula for ratemaking from the lectures to answer the following: 1. For the initial condition, what is the average customer rate in cents/KWhr? 2. What is the new rate when the gas plant is added, assuming the same capital structure and no increase in sales? 3. What is the rate if there is no separate fuel rider, i.e. fuel is considered an operating cost? 4. If the utility decided to enter into a Purchase Power Agreement for the same output @$40/MWhr, would the customer be better off or not? Assume the purchase power agreement would be considered an operating cost.

How should i Calculate number 4?

0 0
Add a comment Improve this question Transcribed image text
Know the answer?
Add Answer to:
A regulated utility is going to add generating capacity to their system and file a rate...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Given a combustion turbine power plant with a capacity factor of 0.18 and a fixed charge...

    Given a combustion turbine power plant with a capacity factor of 0.18 and a fixed charge rate of 15%. The plant has the following costs parameters: Capital Cost = $450/kW Heat Rate = 10,500 BTU/kWh Fuel Cost = $5.25/MMBTU Variable O&M Costs = $0.0058/kWh What is the unit cost of electricity for this plant?

  • An electrical utility is experiencing a sharp power demand that continues to grow at a high...

    An electrical utility is experiencing a sharp power demand that continues to grow at a high rate in a certain local area. Two alternatives are under consideration. Each is designed to provide enough capacity during the next 25​ years, and both will consume the same amount of​ fuel, so fuel cost is not considered in the analysis. bullet Alternative A.  Increase the generating capacity now so that the ultimate demand can be met without additional expenditures later. An investment of...

  • d.autdenBbcswebdav/pid-4710720-dt-content-rid-8396703 4/institution/Papers/ENEL804/Publish/BE ENEL804 EX +Automatic Zoom Question 4 (10 marks). A 50 MW combined-cycle plant with a heat rate of 7,700...

    d.autdenBbcswebdav/pid-4710720-dt-content-rid-8396703 4/institution/Papers/ENEL804/Publish/BE ENEL804 EX +Automatic Zoom Question 4 (10 marks). A 50 MW combined-cycle plant with a heat rate of 7,700 Btu/kWh operates with a 50% capacity factor and the cost is $600/kW Natural gas fuel costs $5 per million Btu. Annual operation and maintenance cost (O&M) is $0.04/kWh. The utility fixed charge rate (FCR) is 0.12 per year. Determine a. The annualized capital cost of the plant (S/yr) b. The annual electricity production (kWh/yr) c. The annual fuel and...

  • An electrical utility is experiencing a sharp power demand that continues to grow at a high...

    An electrical utility is experiencing a sharp power demand that continues to grow at a high rate in a certain local area.Two alternatives are under consideration. Each is designed to provide enough capacity during the next 25​ years, and both will consume the same amount of​ fuel, so fuel cost is not considered in the analysis. •Alternative A. Increase the generating capacity now so that the ultimate demand can be met without additional expenditures later. An investment of ​$20 million...

  • An electrical utility is experiencing a sharp power demand that continues to grow at a high...

    An electrical utility is experiencing a sharp power demand that continues to grow at a high rate in a certain local area.Two alternatives are under consideration. Each is designed to provide enough capacity during the next 25​ years, and both will consume the same amount of​ fuel, so fuel cost is not considered in the analysis. •Alternative A. Increase the generating capacity now so that the ultimate demand can be met without additional expenditures later. An investment of ​$20 million...

  • An electrical utility is experiencing a sharp power demand that continues to grow at a high rate in a certain loca...

    An electrical utility is experiencing a sharp power demand that continues to grow at a high rate in a certain local area. Two alternatives are under consideration. Each is designed to provide enough capacity during the next 25 years, and both will consume the same amount of fuel, so fuel cost is not considered in the analysis. • Alternative A. Increase the generating capacity now so that the ultimate demand can be met without additional expenditures later. An investment of...

  • Case 27 To Use or Not to Use? Beaufort Sea Production Company (BSPC) operates a medium-sized...

    Case 27 To Use or Not to Use? Beaufort Sea Production Company (BSPC) operates a medium-sized oil field on Alaska’s north coast. The field is still producing at its maximum rate, 325,000 barrels of oil per day (BOPD). However, to sustain this rate the company started a waterflood of the reservoir two years ago. Now a capacity bottleneck in the water disposal process is threatening to curtail production. In waterflooding, salt water from the Beaufort Sea is treated to remove...

  • Analyze the case the answer the questions: introduction of the case assess the financial reporting landscape...

    Analyze the case the answer the questions: introduction of the case assess the financial reporting landscape considering the user needs, constraints, and business environment, identify the issues, analyze the issues (qualitatively and quantitatively), and provide a recommendation and conclusion. Original content only no copy-paste, please INTRODUCTION Jaden McCoy operated a dairy goat farm in Soddy-Daisy, Tennessee, and was considering expanding the rental of his goats for land clearing. In early 2011, McCoy successfully bid on a job to clear a...

  • use following to solve 3) Using an order of magnitude method (Hill), estimate the TCI in...

    use following to solve 3) Using an order of magnitude method (Hill), estimate the TCI in year 2006 dollars for a grass-roots plant with 100,000-lb annual production using an order-of-magnitude method based on a 10,000-lb annual production. The plant contains three 1200-ft/min centrifugal fans, five 1500-ft/min centrifugal blowers, seven 100-ft' centrifugal separators, and two 100-ft shell-and-tube heat exchangers. You may assume all materials are carbon steel, the materials handled are primarily solid, and that this plant construction is done fully...

  • Ashley Oakley was hired by the Battleground Nurseries (BN), a commercial nursery and landscape supply company...

    Ashley Oakley was hired by the Battleground Nurseries (BN), a commercial nursery and landscape supply company in Oak Ridge, NC, as an Analyst in their newly-formed Project Office (PO). She reported to work and was assigned a small cubicle with an old laptop computer. Not what she had hoped for in her first job, but she was grateful to land her first job in a rapidly growing economy and resolved to give it her best effort. The PO reported to...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT