Management at Webster Chemical Company is concerned as to whether caulking tubes are being properly capped. If a significant proportion of the tubes are not being sealed, Webster is placing its customers in a messy situation. Tubes are packaged in large boxes of 144 . Several boxes are inspected, and the following numbers of leaking tubes are found: Sample Tubes Sample Tubes Sample Tubes 1 8 8 3 15 4 2 5 9 6 16 7 3 3 10 6 17 8 4 8 11 5 18 3 5 2 12 7 19 0 6 1 13 3 20 4 7 6 14 3 Total 92 Calculate p-chart three -sigma control limits to assess whether the capping process is in statistical control.
The UCL Subscript p =
and the LCL Subscript p =
The formula for p chart is
UCL = p_bar + 3*sqrt(p_bar*(1-p_bar)/n_bar)
LCL = p_bar - 3*sqrt(p_bar*(1-p_bar)/n_bar)
CL = p_bar
p_bar = total number of defects / total number of samples
The calculated values are shown below along with the p chart. We can see that the process is in control
Management at Webster Chemical Company is concerned as to whether caulking tubes are being properly capped....
Management at Webster Chemical Company is concerned as to whether caulking tubes are being properly capped. If a significant proportion of the tubes are not being sealed, Webster is placing its customers in a messy situation. Tubes are packaged in large boxes of 145145. Several boxes are inspected, and the following numbers of leaking tubes are found: Sample Tubes Sample Tubes Sample Tubes 1 11 8 22 15 55 2 99 9 88 16 44 3 44 10 22...
Management at Webster Chemical Company is concerned as to whether caulking tubes are being properly capped. If a significant proportion of the tubes are not being sealed, Webster is placing its customers in a messy situation. Tubes are packaged in large boxes of 135. Several boxes are inspected, and the following numbers of leaking tubes are found Tubes Sample 15 16 17 18 Tubes Sample Tubes Sample 4 10 4 4 12 13 20 Total 87 Calculate p-chart three-sigma control...
Calculate p-chart three-sigma control limits to asses whether the capping process is in statistical control. SHOW ALL WORK 17. Management at Webster, in Problem 16, is now concerned as to whether caulking tubes are being properly capped. If a significant proportion of the tubes are not being sealed, Webster is placing its customers in a messy situation. Tubes are packaged in large boxes of 144. Several boxes are inspected, and the following numbers of leaking tubes are found: Sample Tubes...
Webster Chemical Company produces mastics and caulking for the construction industry. The product is blended in large mixers and then pumped into tubes and capped. Management is concerned about whether the filing process for tubes of caulking is in statistical control. The process should be centered on 8 ounces per tube, Several samples of eight tubes were taken, each tube was weighted and the weights in the Table 3.3 were obtained. Several samples of eight tubes were taken, each tube...
At Webster Chemical, lumps in the caulking compound could cause difficulties in dispensing a smooth bead from the tube. Even when the process is in control, there will still be an average of 4 lumps per tube of caulk. Testing for the presence of lumps destroys the product, so Webster takes random samples. The table below shows the results of the study. Determine the two-sigma upper and lower control limits for this process Tube # Lumps Tube # Lumps Tube...
The Canine Gourmet Company produces delicious dog treats for canines with discriminating tastes. Management wants the box-filling line to be set so that the process average weight per packet is 42grams. To make sure that the process is in control, an inspector at the end of the filling line periodically selects a random box of 8packets and weighs each packet. When the process is in control, the range in the weight of each sample has averaged 6 grams. a. Design...
The following are quality control data for a manufacturing process at Kensport Chemical Company. The data show the temperature in degrees centigrade at five points in time during a manufacturing cycle. Sample x R 1 95.72 1.0 2 95.24 0.9 3 95.18 0.9 4 95.48 0.4 5 95.46 0.5 6 95.32 1.1 7 95.40 1.0 8 95.44 0.3 9 95.08 0.2 9 10 10 95.50 0.6 11 95.80 0.6 12 95.22 0.2 13 95.60 1.3 14 95.22 0.5 15 95.04...
A shirt manufacturer buys cloth by the 100-yard roll from a supplier. For setting up a control chart to manage the irregularities (e.g., loose threads and tears), the following data were collected from a sample provided by the supplier. SAMPLE 1 2 3 4 5 6 7 8 9 10 IRREGULARITIES 3 5 2 6 5 4 6 3 4 5 a. Determine the c¯, UCL and LCL for a c-chart. (Round your answers to 2 decimal places.) c-bar =...
Inter State Moving and Storage Company is setting up a control chart to monitor the proportion of residential moves that result in written complaints due to late delivery, lost Items, or damaged items. A sample of 60 moves is selected for each of the last 12 months. The number of written complaints in each sample is 8, 7, 2, 3, 4, 5, 12, 7, 9, 6, 6, and 14. points Click here for the Excel Data File a. Insert the...
kon over the past 10 days are given below. Sample size is 100. Day Defectives 1 7 2 9 3 9 4 11 5 7 6 8 7 0 8 11 9 13 10 2 a) The upper and lower 3-sigma control chart limits are: UCL, -(enter your response as a number between 0 and 1, rounded to three decimal places). LCL - Center your response as a number between 0 and 1, rounded to three decimal plocos). b) Given...