A certain process has specifications of 15 to 25 for a particular characteristic. An X-bar/R control chart has bee in-pace and R-bar was 7.6; X-double-bar was 20.0, for a week there were no out-of-control points or patterns detected. Is this process capable of producing this characteristic within this specification? The subgroup size was 5. Second provide the cp value?

0 0
Add a comment Improve this question Transcribed image text
Know the answer?
Add Answer to:
A certain process has specifications of 15 to 25 for a particular characteristic. An X-bar/R control...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Problem no.3 The thickness of a metal part is the quality characteristic that statistical process control...

    Problem no.3 The thickness of a metal part is the quality characteristic that statistical process control is being applied to. Measurements are taken from 25 subgroups of subgroup size 5. The sum of the X-bar values 1.5735. The sum of the R-values .0231. Xbar/R Chart for x 0636 06396 Subgroup 10 15 20 25 001 0011 a.) Calculate the trial control limits and centerlines for the X-bar and R charts above b.) Calculate the revised control limits and centerlines for...

  • I will rate 1. For constructing a X-bar chart, subgroup sample average (x bar) and range(r)...

    I will rate 1. For constructing a X-bar chart, subgroup sample average (x bar) and range(r) are computed for each of 24 preliminary samples using a sample size n=5. 24 24 We have the following data summary: Ex-816 and r - 113 Il El (a) Find the following for X-bar chart:(6 pts) Upper control limit, Center line, and Lower controllimit (b) Find the following for R chart: (6 pts) Upper controllimit, Center line, and Lower controllimit: (c) Calculate the fraction...

  • 1. For constructing a X-bar chart, subgroup sample average (x bar) and range (r) are computed...

    1. For constructing a X-bar chart, subgroup sample average (x bar) and range (r) are computed for each of 24 preliminary samples using a sample size n=5. We have the following data summary: 24 24 Ex;=816 and Er;= 113 i = 1 i = 1 (a) Find the following for X-bar chart: 06 pts) Upper control limit, Center line, and Lower control limit (b) Find the following for R chart: (6 pts) Upper control limit, Center line, and Lower control...

  • Design X-bar and R charts a control chart with "standards given" as an aimed-at mean of...

    Design X-bar and R charts a control chart with "standards given" as an aimed-at mean of Xo = 4.0, Sigma = .0033, and Subgroup size = 5. It is not necessary to sketch the control-chart since we have no points to put on it. Just specify, CL, UCL and LCL. That is the design. Then find the probability of in-control nonconformance given, USL = 4.00995 and LSL = 3.99005 Also, by theory, what is the Probability of an out-of-control point...

  • 1. Design X-bar and R charts a control chart with "standards given" as an aimed-at mean...

    1. Design X-bar and R charts a control chart with "standards given" as an aimed-at mean of Xo 4.0, Sigma 0033, and Subgroup size 5. It is not necessary to sketch the control-chart since we have no points to put on it. Just specify, CL, UCL and LCL. That is the design. 2. Then find the probability of in-control nonconformance given, USL 4.00995 and LSL = 3.99005 3. Also, by theory, what is the Probability of an out-of-control point when...

  • I will rate 2. A process has a X-bar control chart with UCL-17.4. LCL-12.79 using a...

    I will rate 2. A process has a X-bar control chart with UCL-17.4. LCL-12.79 using a 3-sigma limit. The subgroup sample size is 3. (a) Estimate the standard deviation of the process, sigma hat. (6 pts) (b) Suppose that the process mean shifts to 13. Find the probability that this shift will be detected on the next sample. (8 pts) (c) Calculate the average run length (ARL) before detecting the shift. (6 pts)

  • 2. A process has a X-bar control chart with UCL=17.4, LCL=12.79 using a 3- sigma limit....

    2. A process has a X-bar control chart with UCL=17.4, LCL=12.79 using a 3- sigma limit. The subgroup sample size is 3. (a) Estimate the standard deviation of the process, sigma hat. (6 pts) (b) Suppose that the process mean shifts to 13. Find the probability that this shift will be detected on the next sample. (8 pts) (c) Calculate the average run length (ARL) before detecting the shift. (6 pts)

  • 1. Design X-bar and R charts a control chart with "standards given" as an aimed-at mean...

    1. Design X-bar and R charts a control chart with "standards given" as an aimed-at mean of Xo = 4.0, Sigma = .0033, and Subgroup size -5. It is not necessary to sketch the control-chart since we have no points to put on it. Just specify, CL, UCL and LCL. That is the design. 2. Then find the probability of in-control nonconformance given, USL = 4.00995 and LSL 3.99005 3. Also, by theory, what is the Probability of an out-of-control...

  • 1. Design X-bar and R charts a control chart with "standards given" as an aimed-at mean...

    1. Design X-bar and R charts a control chart with "standards given" as an aimed-at mean of Xo = 4.0, Sigma = .0033, and Subgroup size -5. It is not necessary to sketch the control-chart since we have no points to put on it. Just specify, CL, UCL and LCL. That is the design. 2. Then find the probability of in-control nonconformance given, USL = 4.00995 and LSL 3.99005 3. Also, by theory, what is the Probability of an out-of-control...

  • A certain process is under statistical control and has a mean value of 130 and a...

    A certain process is under statistical control and has a mean value of 130 and a standard deviation of 8. The specifications for the process are: a. USL (upper specification limit) = 150 b. LSL(lower specification limit) =100 a. Calculate the cp and cpk b. Which of these indices is a better measure of process capability and why? c. Assuminng a normal distribution what percentage of output is expected to fall ourside the specification. Why is it important to know...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT