Using the worksheet, calculate a Tc or Tt for the basins:
1) Jefferson County, Arkansas
AB sheet flow 85 lf, Bermuda grass, slope is 2%
BC shallow concentrated flow 300 lf, short grass prairie, slope 4%
CD channel flow 1200 lf, dirt ditch 6’x6’, 90 degree sides, 4’ deep flow, slope 2%
2) Gordon County, Georgia
AB sheet flow 100 lf, short grass prairie grass, slope is 1%
BC shallow concentrated flow 600 lf, Bermuda & brush, slope 4%
CD channel flow 2500 lf, concrete ditch 10’x10’, 90 degree sides, 4’ deep flow,
slope 2%
Please note the source of any values that you research.
Ans 1) We know, time of concentration (tc ,AB) for sheet flow :
tc, AB = 0.007 (NL)0.8 / P0.5 S0.4
where, N = Manning roughness coefficient = 0.41 for bermuda grass
L = Sheet flow length = 85 ft
P = 2 yr 24 rainfall = 2.4 in for Jefferson, Arkansas (from NRCS data)
S = Slope = 2%
Putting values,
tc = 0.007 (0.41 x 85)0.8 / (2.4)0.5 (0.02)0.4
=> tc = 0.37 hr or 22.2 min
Now,
For shallow concentrated flow , tc, BC = Length / Velocity
Velocity of flow for short grass prairie = 6.962 s1/2
=> V = 6.962 (0.04)1/2 = 1.39 ft/s
=> tc,BC = 300 ft / 1.39 ft/s
=> tc,BC = 215.8 sec or 3.60 min
Now,
For channel flow flow , tc,CD = Length / Velocity
Velocity of flow for channel flow = (1/N) R2/3 S1/2
where, N = Manning roughness coefficient = 0.025 for dirt ditch
R = Hydraulic depth = Area / Wetted perimeter
Area = 6 x 6 = 36 ft2
Wetted perimeter = B + 2 D = 6 + 2(4) = 14 ft
=> R = 36 / 14 = 2.57 ft
=> V = (1 / 0.025) (2.57)2/3 (0.02)1/2
=> V = 10.61 ft/s
=> tc,CD = 1200 / 10.61 = 113.1 sec or 1.88 min
Total time of concentration = tc,AB + tc,BC + tc,CD = 22.2 + 3.6 + 1.88 = 27.68 min
Ans 2) We know, time of concentration (tc ,AB) for sheet flow :
tc, AB = 0.007 (NL)0.8 / P0.5 S0.4
where, N = Manning roughness coefficient = 0.15 for short grass prairie
L = Sheet flow length = 100 ft
P = 2 yr 24 rainfall = 2 in for Jefferson, Arkansas (from NRCS data)
S = Slope = 1%
Putting values,
tc = 0.007 (0.15 x 100)0.8 / (2)0.5 (0.01)0.4
=> tc = 0.27 hr or 16.2 min
Now,
For shallow concentrated flow , tc, BC = Length / Velocity
Velocity of flow for long grass = 2.516 s1/2
=> V = 2.516 (0.04)1/2 = 0.5 ft/s
=> tc,BC = 600 ft / 0.5 ft/s
=> tc,BC = 1200 sec or 20 min
Now,
For channel flow flow , tc,CD = Length / Velocity
Velocity of flow for channel flow = (1/N) R2/3 S1/2
where, N = Manning roughness coefficient = 0.012 for concrete ditch
R = Hydraulic depth = Area / Wetted perimeter
Area = 10 x 10 = 100 ft2
Wetted perimeter = B + 2 D = 10 + 2(4) = 18 ft
=> R = 100 / 18 = 5.55 ft
=> V = (1 / 0.012) (5.55)2/3 (0.02)1/2
=> V = 37 ft/s
=> tc,CD = 2500 / 37 = 67.56 sec or 1.12 min
Total time of concentration = tc,AB + tc,BC + tc,CD = 16.2 + 20 + 1.12 = 37.32 min
Using the worksheet, calculate a Tc or Tt for the basins: 1) Jefferson County, Arkansas AB...