A model town with a population of 100000 people has a drinking water treatment plant. As...
b. A water treatment plant is to process water to a population of 150000 The following data are furnished to facilitate the design of the rapid sand filter units Average day demand 300 L/cap.d 24h Assume that the maximum day demand 1.5 times the average Number of filter units Rate of filtration: Length: Maximum lateral travel of washwater not to exceed 1 m Rate of backwash: Desirable sand bed expansion: 40% Washwater tank capacity: to wash two filters for 5...
( Water & Westwater Treatment Curse ) b) Design of a Sand Filter A 1) Design a new sand filter for a small operation. The est rate for this site is 1880 m/day. The surface overflow ra exceed 145 m3/m2/d. What will be the surface area of the f can use some leftover Ottawa sand (dzo - 0.00055m) from your filtration project. How deep should the filter be? (C3) (5) te shod You 2) The filter unit can remove 70%ofturbidity...
You are assigned to operate a drinking water treatment plant which has a capacity of 280 ML per day. If 5% of total raw water influent was used for filter backwashing without recycling and another 5% was lost due to sludge discharge and chlorine needs to be dosed is at 1 mg L-1 for the water after treatment, calculate the mass of chlorine that needs to be dosed each day at the treatment plant.
You are assigned to operate a drinking water treatment plant which has a capacity of 280 ML per day. The source water is from a river that contains a high concentration of dissolved organic carbon (DOC), (13 mg L-1) and has a high colour (60 HU) but where the alkalinity changes seasonally. In summer to winter the alkalinity is high (> 100 mg L-1 as CaCO3) and in spring after snow has melted in the mountains and the water flows...
Situation: The town of Waterville has the following past population data projected beyond 1990 Year Population 10,240 12,150 18,430 26210 22,480 32.410 45,050 57,200 64,030 77,320 1900 1910 1920 1930 1940 1950 1960 1970 1980 1990 The average water consumption (including every possible sector) is 160 gal/cap-day in 1998. The town has a wastewater treatment plant with a treatment capacity of 30 MGD. Due to the rapid growth of the population, the town is planning to build a new wastewater...
Separating a Mixture, Recrystallization, pre-lab assignment could you also explain why you chose that substance for the empty spaces and question marks EXPERIMENT 4 Pre-Lab Assignment Separating a Mixture, Recrystalliration Name Date 1. Complete the following flowchart which shows how to separate a mixture of sand, sodium chloride and acetanilide. Notice that after a separation process (a down arrow) the filtered solids are shown on the left and the filtrate (the liquid) is shown on the right. The terminal step...
Working on the questions at the end of this lab report (see above). I need help answering questions 2, 3, and 4 completely and thoroughly. Thank you! s, until the I hexano 1 clean disti CYCLOHEXENE from CYCLOHEXANOL be dehydrated with solfuric acid to yield cyclohexene and waterf Add a 0°C (record ct and cal H,SO + H20 ainer. s in purification of any crude product are (a) the preliminary separation of the product from the reaction mixture by distillation...
SYNOPSIS The product manager for coffee development at Kraft Canada must decide whether to introduce the company's new line of single-serve coffee pods or to await results from the product's launch in the United States. Key strategic decisions include choosing the target market to focus on and determining the value proposition to emphasize. Important questions are also raised in regard to how the new product should be branded, the flavors to offer, whether Kraft should use traditional distribution channels or...