Question
( Water & Westwater Treatment Curse )




b) Design of a Sand Filter A 1) Design a new sand filter for a small operation. The est rate for this site is 1880 m/day. The surface overflow ra exceed 145 m3/m2/d. What will be the surface area of the f can use some leftover Ottawa sand (dzo - 0.00055m) from your filtration project. How deep should the filter be? (C3) (5) te shod You 2) The filter unit can remove 70%ofturbidity from the source water The effluent co Calculate the initial concentration of the turbid water? What steps are required to achieve 90%removal fromthis filterunit (2+3) (C) ncentration of the turbidity is found to be 0.5 NTU.
0 0
Add a comment Improve this question Transcribed image text
Answer #1

3 103ス兀ン CoM ie m of Lteme dua

Add a comment
Know the answer?
Add Answer to:
( Water & Westwater Treatment Curse ) b) Design of a Sand Filter A 1) Design...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • B. A water treatment plant is to process water to a population of 150000 The following data are f...

    b. A water treatment plant is to process water to a population of 150000 The following data are furnished to facilitate the design of the rapid sand filter units Average day demand 300 L/cap.d 24h Assume that the maximum day demand 1.5 times the average Number of filter units Rate of filtration: Length: Maximum lateral travel of washwater not to exceed 1 m Rate of backwash: Desirable sand bed expansion: 40% Washwater tank capacity: to wash two filters for 5...

  • Water and Wastewater Treatment SP-WATER TREATMENT PLANT SEDIMENTATION BASIN Design a rectangular, horizontal flow sedimentation process...

    Water and Wastewater Treatment SP-WATER TREATMENT PLANT SEDIMENTATION BASIN Design a rectangular, horizontal flow sedimentation process for a water treatment plant for turbidity removal Design Maximum Day Flow-20,000 m2ld Two parallel sedimentation tank, each designed for half of the total flow Depth 4.5 m, Width 6 m, Surface Overflow Rate 50 m/day Chain and flight sludge collector will be used, hence the limiting width of 6 m. Minimum Hydraulic Retention Time (detention time) 2 hrs Maximum weir rate 250 m/day/m...

  • 10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated...

    10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated sludge operation that adversely affect effluent quality with origins in the engineering, hydraulic and microbiological components of the process. The real "heart" of the activated sludge system is the development and maintenance of a mixed microbial culture (activated sludge) that treats wastewater and which can be managed. One definition of a wastewater treatment plant operator is a "bug farmer", one who controls the aeration...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT