Are there any experts in the construction field that can help with construction estimating homework?
To do construction estimate, we have to follow some steps :
i) First, we have to prepare Detailed project report ( DPR) which consists of plan, design,other necessary calculations.
ii) then, we have to prepare a quantity bill , generally known as Bill of quantity, which consists of material quantity with there rate according to rate chart, labour quantity and the rate of other necesaary things.
This bill of quantity is the construction estimation, where based on the plan and design we have to find out the volume and then material quantity by multiplying their density and then accroding to rate chart we have to multiply the rate to find out the total amount.
Are there any experts in the construction field that can help with construction estimating homework?
I need some help on this question for my stats homework, any help is appreciated! Thank you! Question: For 3 and 4, find the sample size needed to give the desired margin of error in estimating a population proportion with the indicated level of confidence. 3. A margin of error within plus or minus 3% with 90% confidence. The sample proportion was 0.3.
1. Define quantity surveying and construction estimating. The parties to a contract are:
Hi experts. Can someone help me with some info about Silver Nitrate? is an ionic compound? is a metal cation or anion? what is the compound composed of? is it treated as a hydrate? is it soluable in water? thanks in advanced.
What are the differences and similarities of estimating dry wall and wet wall construction? What methods are used to estimate each material?
Can i get some help on this homework
hi experts! i need some more help with my homework. actually i just need the answer for number 53. but because it is related to number 35 and 36. i hope you don't mind to help me solve all those three problems. (p.s: number 35 and 36 already answered by some experts on the book solution) hope it will make you easier to solve number 53. thanks a lot ? 35. Suntrek, a global apparel company, is adding a new...
Which of the following forecasting methods uses top experts in the field? executive opinions the Delphi method sales force composites quantitative analysts
Can someone plz help me with the homework 52.0
Help please Homework: HW16 - Estimating a Population Proportion Score: 0 of 2 pts 7.1.35-T Save 13 of 16 (15 complete) HW Score: 83%, 20.75 of 25 pts Question Hep You are the operations manager for an airline and you are considering a higher fare level for passengers in aisle seats. How many randomly selected air passengers must you survey? Assume that you want to be 90% confident that the sample percentage is within 3 serena w pots of ho...
confused, thanks for any help 7. Arlington Company is constructing a building. Construction began on January 1 and was completed on December 31. Expenditures were $6,400,000 on March 1, S5,280,000 on June 1, and $8,000,000 on December 31. Arlington Company borrowed $3,200,000 on January 1 on a 5-year, 12% note to help finance construction of the building. In addition, the company had outstanding all year a 10%, 3-year, $6,400,000 note payable and an 11%, 4-year, $12,000,000 note payable. What is...