Question

1. Develop a project budget to add an unattached garage to your existing home. The garage...

1. Develop a project budget to add an unattached garage to your existing home. The garage will hold 3 cars, have a brick front and the remaining three sides will be wood. It will have electricity, two doors, two garage door openers, and will be heated. The project duration is six weeks. The project budget must list the project costs by week. The project budget should include labor costs for different skilled labor, material costs for different categories of material, and contingency cost for risk. You must have a minimum of 15 cost items and a maximum of 30 cost items. Examples of cost items may include: People (Architect), Material (Wood), or Equipment (Crane). Total your costs by week and by cost item and provide a grand total – including contingency. Complete the assignment using Microsoft Excel.

0 0
Add a comment Improve this question Transcribed image text
Answer #1

It’s about $40 per square foot to add an attached garage onto a home. A detached one can run up to $70 per square foot.

The price for installing other typical sizes include:

  • One-car (12x22 feet): $11,000 (attached) - $18,000 (detached)
  • Three-car (40x30): $48,000 (attached) - $84,000 (detached)
  • Four-car (48x30): $57,000 (attached) - $101,000 (detached)

The price can range from $11,000-$27,000 for a one- or two-car structure. “Attached” means you can access it directly from your home. They tend to cost less because of their use of existing walls, power and HVAC systems.

Add a comment
Know the answer?
Add Answer to:
1. Develop a project budget to add an unattached garage to your existing home. The garage...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Business 1B - Managerial Accounting - Master Budget Comprehensive Project Radical Boards, Inc. manufactures and sells...

    Business 1B - Managerial Accounting - Master Budget Comprehensive Project Radical Boards, Inc. manufactures and sells a single model The unit cost for ending FG inventory at 12/31/11 was $374.80. of snowboard, the Vortex. In the summer of 2011, Ignore Work In Process Iggy Sawdust, CPA, provided data for the 2012 budget: Direct Material Requirements (per snowboard) The December 2012 Budget Includes the following selected balances: Wood 5 board feet (b.f.) Cash $      10,000.00 Fiberglass 6 yards Property, Plant, and Equipment...

  • Business 1B - Managerial Accounting - Master Budget Comprehensive Project Radical Boards, Inc. manufactures and sells...

    Business 1B - Managerial Accounting - Master Budget Comprehensive Project Radical Boards, Inc. manufactures and sells a single model The unit cost for ending FG inventory at 12/31/11 was $374.80. of snowboard, the Vortex. In the summer of 2011, Ignore Work In Process Iggy Sawdust, CPA, provided data for the 2012 budget: Direct Material Requirements (per snowboard) The December 2012 Budget Includes the following selected balances: Wood 5 board feet (b.f.) Cash $      10,000.00 Fiberglass 6 yards Property, Plant, and Equipment...

  • Course Project: Master Budget Using Excel Milo-Freeze Company Description This course contains a Course Project, where...

    Course Project: Master Budget Using Excel Milo-Freeze Company Description This course contains a Course Project, where you will be required to submit the final completed project at the end of Week 7. Using the budgeting assumptions provided for Milo-Freeze Company, you will prepare a sales budget, a production budget, a direct materials budget and a schedule of expected cash payments for purchases of materials. An Excel template will be provided and required to use to complete and submit. Budgeting Assumptions...

  • Business 1B - Managerial Accounting - Master Budget Comprehensive Project Radical Boards, Inc. manufactures and sells...

    Business 1B - Managerial Accounting - Master Budget Comprehensive Project Radical Boards, Inc. manufactures and sells a single model The unit cost for ending FG inventory at 12/31/11 was $374.80. of snowboard, the Vortex. In the summer of 2011, Ignore Work In Process Iggy Sawdust, CPA, provided data for the 2012 budget: Direct Material Requirements (per snowboard) The December 2012 Budget Includes the following selected balances: Wood 5 board feet (b.f.) Cash $      10,000.00 Fiberglass 6 yards Property, Plant, and Equipment...

  • Business 1B - Managerial Accounting - Master Budget Comprehensive Project Radical Boards, Inc. manufactures and sells...

    Business 1B - Managerial Accounting - Master Budget Comprehensive Project Radical Boards, Inc. manufactures and sells a single model The unit cost for ending FG inventory at 12/31/11 was $374.80. of snowboard, the Vortex. In the summer of 2011, Ignore Work In Process Iggy Sawdust, CPA, provided data for the 2012 budget: Direct Material Requirements (per snowboard) The December 2012 Budget Includes the following selected balances: Wood 5 board feet (b.f.) Cash $      10,000.00 Fiberglass 6 yards Property, Plant, and Equipment...

  • ACC 203-Budgetary Planning Project Fall 2019 DIB corporation’s managerial accountants and the budget committee is meeting...

    ACC 203-Budgetary Planning Project Fall 2019 DIB corporation’s managerial accountants and the budget committee is meeting in November to prepare the 2019 budget. Your task, as a member of the budget committee, is to prepare the 2019 budget given the following data: Sales: The company expects to sell 40% more units in 2019 than in each quarter of 2018. During 2018, sales were Q1: 40,000; Q2: 30,000; Q3: 60,000 and Q4: 50,000 units. The selling price per unit is expected...

  • Rationale The focus of the project is to develop your database programming skills. This project will...

    Rationale The focus of the project is to develop your database programming skills. This project will help you get a fair idea of the sales and distribution system in any organization that has a chain of Carrying and Forwarding Agents (CFAs) or super stockists and stockists. You will be able to implement database programming concepts of ADO.NET in VB.NET and ASP.NET to create a real-life, web-based database application. (VB stands for Visual Basic.) Scenario Smooth Pen, Inc., a pen manufacturing...

  • I need this answered in Microsoft Excel please GBCoffee Budget Project The GBCoffee Company roasts and...

    I need this answered in Microsoft Excel please GBCoffee Budget Project The GBCoffee Company roasts and sells high quality certified sustainable coffee beans. The final one pound bags of roasted whole coffee beans has two direct materials – coffee beans and packaging. GBCoffee is preparing budgets for the fourth quarter ending December 31, 2019. For each requirement below prepare budgets by month for October, November, and December, and a total budget for the quarter. 1. The previous year’s sales for...

  • In the Week 1 Lesson Video, you were introduced to the team at Getta Byte Software. Your assignment this week is to discuss the billing project charter and submit a one- to two-page paper. Consider wh...

    In the Week 1 Lesson Video, you were introduced to the team at Getta Byte Software. Your assignment this week is to discuss the billing project charter and submit a one- to two-page paper. Consider what additional risks, assumptions, or requirements Getta Byte should include in this charter. Getta Byte Software—The Project Scope We need a new billing system. Why? The one we have works fine. It's manual, time-consuming, and inaccurate. There is that... So, it has to be automated,...

  • Project Steps: 1. Database Design 1.1. Design and create a database in third normal form based...

    Project Steps: 1. Database Design 1.1. Design and create a database in third normal form based on the following requirements: • Each Job is for a specific customer and there can be more than one job per customer. • The name and address must be tracked for each customer. • Each job is described by up to 2000 characters. • Each job has a status of ‘open, ‘in process’, or ‘complete’. • Each job has a start date and end...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT