Question

4(b) A 3-km stretch of highway is known locally as "Fog Hollow". In an attempt to...

4(b) A 3-km stretch of highway is known locally as "Fog Hollow". In an attempt to reduce accidents, the shoulders along Fog Hollow could be widened and paved at a cost of S0.35 million per km, and large dynamic message signs could be installed at both ends of the dangerous stretch. The signs would be controlled by a computer connected to sensing devices to display recommended speeds for various fog conditions. The fog warning signs could be installed for $200,000. These will have $1,000 operating and maintenance costs during the first year of operation and these costs will rise at a rate of 2% per year for the subsequent years. The life of this system is 5 years. If the average accident cost in Fog Hollow amounts to $30,000, how many accidents per year would have to be avoided by the project to make it acceptable for a 20-year study period? The life of widened paved shoulder is 20 years. The MARR (i.e. discount rate) used for such projects is 10%. Assumption: Maintenance of the paved shoulder is a part of the overall highway and is not included here. Hint: Determine the minimum benefit value that would allow the project to be feasible. Accidents avoided per year will be treated as a benefit.

0 0
Add a comment Improve this question Transcribed image text
Know the answer?
Add Answer to:
4(b) A 3-km stretch of highway is known locally as "Fog Hollow". In an attempt to...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • How can we assess whether a project is a success or a failure? This case presents...

    How can we assess whether a project is a success or a failure? This case presents two phases of a large business transformation project involving the implementation of an ERP system with the aim of creating an integrated company. The case illustrates some of the challenges associated with integration. It also presents the obstacles facing companies that undertake projects involving large information technology projects. Bombardier and Its Environment Joseph-Armand Bombardier was 15 years old when he built his first snowmobile...

  • I have this case study to solve. i want to ask which type of case study...

    I have this case study to solve. i want to ask which type of case study in this like problem, evaluation or decision? if its decision then what are the criterias and all? Stardust Petroleum Sendirian Berhad: how to inculcate the pro-active safety culture? Farzana Quoquab, Nomahaza Mahadi, Taram Satiraksa Wan Abdullah and Jihad Mohammad Coming together is a beginning; keeping together is progress; working together is success. - Henry Ford The beginning Stardust was established in 2013 as a...

  • 10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated...

    10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated sludge operation that adversely affect effluent quality with origins in the engineering, hydraulic and microbiological components of the process. The real "heart" of the activated sludge system is the development and maintenance of a mixed microbial culture (activated sludge) that treats wastewater and which can be managed. One definition of a wastewater treatment plant operator is a "bug farmer", one who controls the aeration...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT