Question

Algorithms Question Select all the correct items. Group of answer choices a. Dynamic programming algorithms are...

Algorithms Question

Select all the correct items.
Group of answer choices
a. Dynamic programming algorithms are often more time-efficient than greedy algorithms.
b. Greedy algorithms are often more time-efficient than dynamic programming algorithms.
c. The optimal solution cannot be guaranteed by greedy algorithms, but dynamic programming guarantees an optimal solution if the optimal sub-structure applies.
d. Dynamic programming may not guarantee an optimal solution, even if the optimal sub-structure applies.

Which of the following greedy strategies results in an optimal solution for the activity selection problem? Select all that applies.

a. Earliest start time
b. Latest finish time
c. Earliest finish time
d. Latest start time

0 0
Add a comment Improve this question Transcribed image text
Answer #1
  1. Solution : The correct answers are “options b and c”.

b. Greedy algorithms are often more time-efficient than dynamic programming algorithms.
c. The optimal solution cannot be guaranteed by greedy algorithms, but dynamic programming

Explanation :

Greedy algorithms provides a locally optimal solution which may not always give optimal final solution but requires less time to reach to a result. On the other hand, dynamic programming breaks down the problem into sub parts in order to get a optimal final solution. Greedy algorithms are less efficient than dynamic algorithms in finding a final optimal solution. However, greedy algorithms takes less time or are more time efficient than that of dynamic programming algorithms.

  1. Solution : The correct answers are “options c and d”.

Earliest finish time

Latest start time

Explanation :

Earliest finish time refers to selection of those activities which have finished or completed earliest. The latest start time of an activity refers to the difference of the latest finish time and the total duration of a that activity. Both of these strategies will ensure that the activities with most probability of getting optimal solution is selected and thus will result in an optimal solution.

Add a comment
Know the answer?
Add Answer to:
Algorithms Question Select all the correct items. Group of answer choices a. Dynamic programming algorithms are...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Consider the following greedy strategies for this problem: 1. Select the earliest finishing interval and discard...

    Consider the following greedy strategies for this problem: 1. Select the earliest finishing interval and discard overlapping intervals. Keep doing this until all intervals have been eliminated (either selected or discarded). 2. Select the earliest starting interval and discard overlapping intervals. Keep doing this until all intervals have been eliminated (either selected or discarded). 3. Select the pair of non-overlapping intervals that have the smallest gap between them: find a pair of intervals i # j such that s; -...

  • C. 7. True/False Questions. (2 points each) a. Applying Horner's Rule, an n-degree polynomial can be...

    C. 7. True/False Questions. (2 points each) a. Applying Horner's Rule, an n-degree polynomial can be evaluated at a given point using only n multiplications and n additions. b. Quick Sort and Merge Sort are comparison-based sorting algorithms. Heap Sort and Distribution Counting Sort are not comparison-based sorting algorithms. An AVL tree applies four types of rotations: RIGHT, LEFT, RIGHT-LEFT, and LEFT-RIGHT. d. When an AVL tree's left sub-tree is left-heavy, a LEFT rotation is needed. e. When an AVL...

  • algorithm TRUE OR FALSE       TRUE OR FALSE    Optimal substructure applies to alloptimization problems.  ...

    algorithm TRUE OR FALSE       TRUE OR FALSE    Optimal substructure applies to alloptimization problems.     TRUE OR FALSE    For the same problem, there might be different greedy algorithms each optimizes a different measure on its way to a solutions.      TRUE OR FALSE Computing the nth Fibonacci number using dynamic programming with bottom-upiterations takes O(n) while it takes O(n2) to compute it using the top-down approach. TRUE OR FALSE Every computational problem on input size n can be...

  • Instead of always selecting the first activity to finish, select the last activity to start that...

    Instead of always selecting the first activity to finish, select the last activity to start that is compatible with all previously selected activities. Accomplish this by implementing a greedy algorithm in either Python or C++. This is similar to a first-to-start algorithm, but in reverse; the goal is to select the start-times that appear later. See the example below and ensure that your output matches the example below. Include a verbal description of your algorithm, pseudocode and analysis of the...

  • I need the report like this (idea) *Sorting Algorithms: A sorting algorithm is an algorithm that...

    I need the report like this (idea) *Sorting Algorithms: A sorting algorithm is an algorithm that puts elements of a list in a certain order. The most-used orders are numerical order and lexicographical order. Efficient sorting is important for optimizing the use of other algorithms (such as search and merge algorithms) which require input data to be in sorted lists; it is also often useful for canonical zing data and for producing human-readable output. More formally, the output must satisfy...

  • Which of the following is true regarding ᐃG? (mark all that apply) Group of answer choices...

    Which of the following is true regarding ᐃG? (mark all that apply) Group of answer choices When Keq is >> 1, ᐃG is large and negative When Keq is << 1, ᐃG is large and positive When Keq is << 1, ᐃG is small and positive When Keq is << 1, ᐃG is large and negative When Keq is >> 1, ᐃG is small and positive 2-Why is coupling of reactions an important biochemical mechanism to allow non-spontaneous reactions to...

  • Given the multistage amplifier below, select all correct statements Multistage-Amp Group of answer choices The collector...

    Given the multistage amplifier below, select all correct statements Multistage-Amp Group of answer choices The collector current in Q2 is approximately 16mA The input impedance of the amplifier is approximately 2.5Megohms The output impedance of the amplifier (assuming Q2) has a Beta=100 is close to 500Kohms The overall gain for the circuit (including loading effects) is approximately 13 If an overall gain for the multistage amplifier of 20 is desired, RG can be selected around 450 to account for any...

  • 22. Select the correct answer from the IUPAC names provided: Group of answer choices something else!...

    22. Select the correct answer from the IUPAC names provided: Group of answer choices something else! 1-butene cis-2-butene 1-butyne trans-2-butene Flag this Question Question 238 pts 23. Select the steps to achieve the desired transformation: Group of answer choices 1. Mg/THF 2. bromoethane 3. dilute acid 4. SOBr2 / pyridine / 0 degrees 5. NaCN / DMSO 6. LAH / -78 / THF 7. diluted base more than one correct answer here 1. Mg/THF 2. ethanol 3. dilute acid 4....

  • Question 1 For each of the following sub-questions, select the best answer. Each correct answer is...

    Question 1 For each of the following sub-questions, select the best answer. Each correct answer is worth two marks. 1. Neither Chile nor Peru has a mass-market café culture, but this fact has not stopped Starbucks from trying to determine what can be done to make its coffee houses successful in those markets. By recognizing that people in these two South American countries do not drink coffee as people in the United States do and that it needs to change...

  • Exercise 2 Linear Programming 1.         The Scrod Manufacturing Co. produces two key items – special-purpose Widgets...

    Exercise 2 Linear Programming 1.         The Scrod Manufacturing Co. produces two key items – special-purpose Widgets (W) and more generally useful Frami (F). Management wishes to determine that mix of W & F which will maximize total Profits (P). Data                                                                      W      F             Unit profit contributions                     $ 30   $ 20             Demand estimates (unit/week)               250      500             Average processing rates – each product requires processing on both machines (units/hour)                                     Machine #1                        2          4                                        Machine #2                ...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT