1. Twenty random samples, each containing 6 items, were taken in a control chart application and it was found that the grand average is = 5.240 cm and = 0.25.
a. What would be the upper and lower control limits for the and R charts.
b. The following measurements are taken last week: 5.2, 4.5, 5.5, 3.4, 5.3, and 5.5. Is the process still in control?
Xbarbar= 5.240,
Rbar = 0.25
Answer a: Control limits of Range are
D4 (n=6)= | 2.004 | ||
D3 (n=6)= | 0 | ||
control limits for Range, | |||
CL or R-bar= Average of all sample Range | 0.250 | ||
UCL=R-bar*D4 | 0.501 | ||
LCL=R-bar*D3 | 0.000 |
D4 and D3 are taken from the table of factors
Control limits of X bar chart are
A2 (n=6) | 0.483 | ||
control limits for X bar, | |||
CL or Xbarbar | 5.240 | ||
UCL=Xbarbar+ (A2)*Rbar | 5.361 | ||
LCL=Xbarbar- (A2)*Rbar | 5.119 |
A2 is taken from the table of factors
Answer b: the average of new measurement = (5.2+ 4.5+ 5.5+ 3.4+ 5.3+ 5.5)/6= 29.4/6 = 4.9 (it is beyond control limits, therefore not capable)
Range= Max-Min= 5.5-3.4= 2.1 (within Range control limits)
1. Twenty random samples, each containing 6 items, were taken in a control chart application and...
Twenty samples of 100 items each were inspected when a process was considered to be operating satisfactorily. In the 20 samples, a total of 135 items were found to be defective. (a) What is an estimate of the proportion defective when the process is in control? (b) What is the standard error of the proportion if samples of size 100 will be used for statistical process control? (Round your answer to four decimal places.) (c)Compute the upper and lower control...
Twenty samples of 100 items each were inspected when a process was considered to be operating satisfactorily. In the 20 samples, a total of 130 items were found to be defective. (a) What is an estimate of the proportion defective when the process is in control? (Round your answer to four decimal places.) (b) What is the standard error of the proportion if samples of size 100 will be used for statistical process control? (Round your answer to four decimal...
eBook Twenty-Six samples of 110 items each were inspected when a process was considered to be operating satisfactorily. In the 26 samples, a total of 135items were found to be defective. a. What is an estimate of the proportion defective when the process is in control? Round your answer to four decimal places. p= b. What is the standard error of the proportion if samples of size 110 will be used for statistical process control? Round your answer to four...
Samples of n = 6 items each are taken from a process at regular intervals. A quality characteristic is measured, and x-bar and R values are calculated for each sample. After 50 samples, we have Compute control limits for the x-bar and R control charts. All points on both control charts fall between the control limits computed in part (a). What are the natural tolerance limits of the process? If the specification limits are 41 ± 5.0, what are your...
Samples ofn-6 items each are taken from a manufacturing process at regular intervals. A normally distributed quality characteristic is measured, and X and S values are calculated for each sample. After 50 samples, we have 50 50 X, = 1000 S,-75 and a) Compute the control limits for the Xand S control charts. b) Assume that all points on both control charts plot within the control limits computed in part (a). What are the natural tolerance limits of the process?...
can you answer A for me ... $6.11 Twelve samples, each containing five parts, were taken from a process that produces steel rods. The length of each rod in the samples was determined. The results were tabulated and sample means and ranges were computed. The results were: SAMPLE SAMPLE MEAN (in.) RANGE (in.) 10.002 0.011 10.002 0.014 9.991 0.007 10.006 0.022 9.997 0.013 9.999 0.012 10.001 0.008 10.005 0.013 9.995 0.004 10 10.001 20.011 to 11 10.001 0.014 12 10.006...
Samples of n = 6 items are taken from a manufacturing process at regular intervals. A normally distributed quality characteristic is measured and ?̅ and S values are calculated for each sample. After 50 subgroups have been analyzed, we have : ∑ ?? ̅50 ?=1 = 1000 and ∑ ?? 50 ?=1 = 75 (a) Compute control limits for the ?̅ and S control charts. (b) Assume that all points on both charts plot within the control limits. What are...
Random samples of size n = 260 are taken from a population with p= 0.10 a. Calculate the centerline, the upper control limit (UCL), and the lower control limit (LCL) for the p chart. (Round the value for the centerline to 2 decimal places and the values for the UCL and LCL to 3 decimal places.) Centerline Upper Control Limit Lower Control Limit b. Calculate the centerline, the upper control limit (UCL), and the lower control limit (LCL) for the...
Random samples of size n-420 are taken from a population with p-0.10. a. Calculate the centerline, the upper control limit (UCL) and the lower control limit (LCL) for the P chart. (Round the value for the centerline to 2 decimal places and the values for the UCL and LCL to 3 declmal places) Centerine Upper Control Limit Lower Control Limit b. Calculate the centerline, the upper control limit (UCL), and the lower control limit (LCL) for the P chart if...
Twelve samples, each containing five parts, were taken from a process that produces steel rods at Emmanual Kodzi's factory. The length of each rod in the samples was determined. The results were tabulated and sample means and ranges were computed. The results were: SAMPLE SAMPLE MEAN (IN.) RANGE (IN.) SAMPLE SAMPLE MEAN (IN.) RANGE (IN.) 1 9.104 0.044 7 9.103 0.021 2 9.100 0.051 8 9.103 0.058 3 9.089 0.042 9 9.097 0.039 4 9.108 0.037 10 9.103 0.038 5...