To supply the plumbing system of New York office building, water needs to be punped to...

To supply the plumbing system of New York office building, water needs to be punped to a tank on the roof, where its height will will provide a “head” of pressure for all the floors. The vertical height berween the basement pump and the level of water in the tank is 95.3m. What gauge pressure does the puml have to apply to the water to get it up to the tank? Density of water=1000kg/m^3 . g=9.8m/s^2
0 0
Add a comment Improve this question Transcribed image text
Know the answer?
Add Answer to:
To supply the plumbing system of New York office building, water needs to be punped to...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • You are building a water supply system with rather cheap pipe that can only safely withstand...

    You are building a water supply system with rather cheap pipe that can only safely withstand a pressure of 34 PSI gauge. You deliver water through an output pipe of area 11 square feet from a reservoir of depth 330 feet. The bottom of the reservoir is at the same level as the output pipe. What is the maximum area of the pipe connecting the reservoir with the output pipe? Density= 2 slugs/cubic foot.

  • (b) Figure Q3 shows a design of a plumbing system to be used in a new building. Water at 20°C is ...

    (b) Figure Q3 shows a design of a plumbing system to be used in a new building. Water at 20°C is free to be pumped from reservoir A to another reservoir B at a higher elevation through two 30 m long pipes connected in parallel on a common elevation level. The difference between the water surface elevations is 10 m. The pipes are made of commercial brass and the diameters of the two pipes are 4 cm and 8 cm....

  • 3.5. The owner of a small office building has decided to design and install a piping...

    3.5. The owner of a small office building has decided to design and install a piping network that includes five tankless water heaters to heat and transport water. The owner currently requires 18 gpm of hot water service. Cold water (feedwater) from the city will be supplied to each heater, and the piping connections were previously installed by the building contractor. The hot water, at 160°F, from the heaters will be transported through a main header for distribution in the...

  • Water at a gauge pressure of 3.8 atm at street level flows into an office building...

    Water at a gauge pressure of 3.8 atm at street level flows into an office building at a speed of 0.63 m/s through a pipe 5.4 cm in diameter. The pipe tapers down to 2.9 cm in diameter by the top floor, 18 m above, where the faucet has been left open. (Figure 1) Calculate the flow velocity in the pipe on the top floor. Assume no branch pipes and ignore viscosity. Express your answer using two significant figures UE...

  • The owner of a small office building asked you to design the new air conditioning system...

    The owner of a small office building asked you to design the new air conditioning system for the building. The system cools the air supplied to the offices using a chiller (cold water refrigeration system). The water requirement for the evaporator in each floor is 18.2 mh. The velocity within the pipe must remain between 1.5 m/s and 2.5 m/s, to ensure the appropriate heat exchange process in the evaporators and minimize the noise. The material of the pipe is...

  • 10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated...

    10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated sludge operation that adversely affect effluent quality with origins in the engineering, hydraulic and microbiological components of the process. The real "heart" of the activated sludge system is the development and maintenance of a mixed microbial culture (activated sludge) that treats wastewater and which can be managed. One definition of a wastewater treatment plant operator is a "bug farmer", one who controls the aeration...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT