Christmas Express makes wreaths in batch sizes of 30. The cutting & assembly process takes 4 minutes per wreath and the decorating process time is 15 minutes per wreath. It takes 4 minutes to move the wreaths from the cutting & assembly process to the decorating process.
Compute the value-added, non-value-added, and the total lead time of the wreath process.
Value-added lead time: | ||
Non-value-added lead time: | ||
Move time | ||
Within batch wait time | ||
Total lead time |
Compute the value-added ratio. Round to one decimal place.
%
(1)
Value added lead time = cutting & assembly process time + decorating process time
= 4 + 15 = 19 minutes
(2)
Non-value added lead time:
Move time = 4 minutes
within batch wait time = (total time to perform operations) X ( batch size - 1)
= ( 4 + 15) X (30 - 1) = 551 minutes
(3)
Total lead time = 19 + 4 + 551 = 574 minutes
(4)
Value added ratio = Value added lead time / Total lead time Value added ratio
= 19/574 = 3.3%
Christmas Express makes wreaths in batch sizes of 30. The cutting & assembly process takes 4...
Christmas Express makes wreaths in batch sizes of 25. The cutting & assembly process takes 6 minutes per wreath and the decorating process time is 9 minutes per wreath. It takes 6 minutes to move the wreaths from the cutting & assembly process to the decorating process. Compute the value-added, non-value-added, and the total lead time of the wreath process. Value-added lead time: Non-value-added lead time: Move time Within batch wait time Total lead time Compute the value-added ratio. Round...
Please write out correct answer and whether it’s A, B, C or D. Thank you. Christmas Express makes wreaths in batch sizes of 12. The cutting & assembly process takes 8 minutes per wreath and the decorating process time is 10 minutes per wreath. It takes 12 minutes to move the wreaths from the cutting & assembly process to the decorating process. Compute the non-value-added lead time. 198 minutes 0216 minutes 228 minutes 210 minutes
The High Altitude Ski Company manufactures skis in the finishing and assembly process. Skis are manufactured in 50-ski batch sizes. The finishing time is 2 minutes per ski. The assembly time is 7 minutes per ski. It takes 18 minutes to move a batch of skis from finishing to assembly. a. Compute the value-added, non-value-added, and total lead time of this process.
Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC boand assembly operation, a number。individuals are esponsible for assenting electronic components into pn te i ut boards. Each operator s es ons le r so den g e net erdg to a given set of instructions. Operators work on batches of s0 printed dircuit boards. Each board requires 4 minutes of board assembly time. After each...
Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 50 printed circuit boards. Each board requires 4 minutes of board assembly time. After each batch is completed, the operator...
Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 50 printed circuit boards. Each board requires 4 minutes of board assembly time. After each batch is completed, the operator...
Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 50 printed circuit boards. Each board requires 4 minutes of board assembly time. After each batch is completed, the operator...
If a product is manufactured in batch sizes of 30 units and it takes 4 minutes to manufacture each unit within each of 2 operations, what is the within-batch wait time? Group of answer choices 240 minutes 116 minutes 232 minutes 120 minutes
Lead Time Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 50 printed circuit boards. Each board requires 4 minutes of board assembly time. After each batch is completed,...
Lead Time Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 50 printed circuit boards. Each board requires 4 minutes of board assembly time. After each batch is completed,...