Question

If a product is manufactured in batch sizes of 30 units and it takes 4 minutes...

If a product is manufactured in batch sizes of 30 units and it takes 4 minutes to manufacture each unit within each of 2 operations, what is the within-batch wait time?

Group of answer choices

240 minutes

116 minutes

232 minutes

120 minutes

0 0
Add a comment Improve this question Transcribed image text
Answer #1
Correct Option A i.e. 240 Minutes
within-batch wait time= No. of Units in a batch * Time taken to manufacture 1 unit * no. of Operations
     =30*4*2
240 Minutes
Add a comment
Know the answer?
Add Answer to:
If a product is manufactured in batch sizes of 30 units and it takes 4 minutes...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Christmas Express makes wreaths in batch sizes of 30. The cutting & assembly process takes 4...

    Christmas Express makes wreaths in batch sizes of 30. The cutting & assembly process takes 4 minutes per wreath and the decorating process time is 15 minutes per wreath. It takes 4 minutes to move the wreaths from the cutting & assembly process to the decorating process. Compute the value-added, non-value-added, and the total lead time of the wreath process. Value-added lead time: Non-value-added lead time: Move time Within batch wait time Total lead time Compute the value-added ratio. Round...

  • Christmas Express makes wreaths in batch sizes of 25. The cutting & assembly process takes 6...

    Christmas Express makes wreaths in batch sizes of 25. The cutting & assembly process takes 6 minutes per wreath and the decorating process time is 9 minutes per wreath. It takes 6 minutes to move the wreaths from the cutting & assembly process to the decorating process. Compute the value-added, non-value-added, and the total lead time of the wreath process. Value-added lead time: Non-value-added lead time: Move time Within batch wait time Total lead time Compute the value-added ratio. Round...

  • 1 . Product A has a unit profit of $40 and takes 10 minutes on the...

    1 . Product A has a unit profit of $40 and takes 10 minutes on the bottleneck; Product B has unit profit of $60 and takes 30 minutes on the bottleneck. Non-bottleneck operations have infinite capacity because capacity can be added at no cost. The bottleneck has a capacity of 24 hours in a day. Should I maximize feasible production of: a. Product A b. Product B   2In terms of setting up a safety program, Heinrich’s Safety Triangle states the...

  • A batch of material must visit two work stations in series to be converted into finished...

    A batch of material must visit two work stations in series to be converted into finished product. Each batch makes 100 units. Setup time at each work station is 30 minutes. Variable processing time is 3 minutes/unit and 5 minutes/unit in station 1 and station 2 respectively. After completing the operation the batch has to wait on average of 1 hour for the material handler to move it to the next machine. Assuming there is no time lost in waiting...

  • Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC boand assembly o...

    Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC boand assembly operation, a number。individuals are esponsible for assenting electronic components into pn te i ut boards. Each operator s es ons le r so den g e net erdg to a given set of instructions. Operators work on batches of s0 printed dircuit boards. Each board requires 4 minutes of board assembly time. After each...

  • Lead Time Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC)...

    Lead Time Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 50 printed circuit boards. Each board requires 4 minutes of board assembly time. After each batch is completed,...

  • Lead Time Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC)...

    Lead Time Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 50 printed circuit boards. Each board requires 4 minutes of board assembly time. After each batch is completed,...

  • Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly,...

    Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 50 printed circuit boards. Each board requires 4 minutes of board assembly time. After each batch is completed, the operator...

  • Anderson Company has the following departmental manufacturing structure for one of its products: 7.5 minutes 15...

    Anderson Company has the following departmental manufacturing structure for one of its products: 7.5 minutes 15 minutes Wait time = 15 min. Move and wait time = 18 min. Molding Welding Move and wait time = 22.5 min. 12 minutes 7 minutes Move and wait time = 19.5 min. Polishing Assembly After some study, the production manager of Anderson recommended the following revised cellular manufacturing approach: 15 minutes 7.5 minutes Welding Molding Polishing Assembly 12 minutes 10.5 minutes Required: 1....

  • Lead Time Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC)...

    Lead Time Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of Soprinted circuit boards. Each board requires 4 minutes of board assembly time. After each batch is completed, the...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT