The nearest building is 1200 ft from site and Ds= 55. Change the type of rock to diorite. a. Dete...
12.8 A project in shale will have an average bench height of 21 ft. ANFO specifie gravity 0,90, will be the explosive used on the project. Dynamite, specifie gravity 1.3, will be the primer explosive used. The es in 10-in.-long 1-in.-diameter sticks. The contractor's equipment can easily drill 34-in. -diameter holes. It is assumed that single rows of no more than 10 holes will be detonated The holes will be lined. The thickness of the lining material is in. To ease the fieldwork all design dimensions should be in integer numbers (f). Calculate an appropriate burden distance for the blast design.
12.8 A project in shale will have an average bench height of 21 ft. ANFO specifie gravity 0,90, will be the explosive used on the project. Dynamite, specifie gravity 1.3, will be the primer explosive used. The es in 10-in.-long 1-in.-diameter sticks. The contractor's equipment can easily drill 34-in. -diameter holes. It is assumed that single rows of no more than 10 holes will be detonated The holes will be lined. The thickness of the lining material is in. To ease the fieldwork all design dimensions should be in integer numbers (f). Calculate an appropriate burden distance for the blast design.