***(unable to provide data except by using pictures)
Solution:
a) The scatter plot graph is drawn for Steps Vs Minutes which is shown below
the above plot shows the linear relationship between steps and minutes.
b)
Linear regression is done its result
the best fitted line is given as Y(steps) = a + b X(minutes)
Y= -9.705 + 0.0055 X.
The hypothesis are
H0: There is no linear relationship between Steps and Minutes walked.
H1: There is linear relationship between Steps and Minutes walked.
the significance level is fixed at 5%
the above results shows p value as 0.007 which is less than 0.05 so there is no significant evidence to accept null hypothesis, therefore there is linear relationship between steps and minutes walked.
d) the plot of linear regression is as follows
.2 6 9 3 8 3 2 1 5 5 4 9 9 9 4 5 7 5 4 7 82445538955922245 5 3 4 3 2 5 3 2 4 3 2 2 4 3 2 3 2 2 2 ...
Question 312 marks An study was conducted using data from pedometers of 68 randomly selected participants. The researchers wanted to know if the number of steps taken by a participant (Steps) could be predicted using the time they spent walking (Minutes). The data are available on MyUni in the file Steps.csv. 2 (a) Produce a scatterplot of Steps vs Minutes and describe any relationship between these two variables. (b) Perform a linear regression analysis on this data in MATLAB and...
Question 3 12 marks An study was conducted using data from pedometers of 68 randomly selected participants. The researchers wanted to know if the number of steps taken by a participant (Steps) could be predicted using the time they spent walking (Minutes). The data are available on MyUni in the file Steps.csv 2(a) Produce a scatterplot of Steps vs Minutes and describe any relationship between these two variables. (b) Perform a linear regression analysis on this data in MATLAB and...
398753847300 7 8 8 3 7 5 8 9 5 1 8 1 9 1 3 1 1 9 4 5 3 1 1 5 7 9 583211 120011120 222221102020112111212 302012213 993221514200 4 7 5 5 2 9 1 6 7 3 3 8 4 9 2 1 6 3 5 7 9 6 1 4 7 4 632286 646204842 41343282 56565555 33282524983465454919 65556566446655656465 6 5 565656556 28443321146216537572767174791778729ー8363526 64907 8786 8 3. 1 4 3 3 8 5 4 8...
2. Given the array A = [2 4 1; 6 7 2; 3 5 9]. Provide appropriate the Matlab commands needed to a. calculate the determinant of A b. show the transpose of A c. Calculate the trace of A d. compute the sum over all rows of A
(1) Write the permutation 1 2 3 4 5 6 7 8 9 10 7 5 10 3 8 9 6 2 4 ( 10 1 as a product of disjoint cycles.
4 machines and 9 jobs Jobj 1 2 3 4 5 6 7 8 9 Pj 4 9 3 3 6 8 8 12 6 Determine a schedule that minimizes the makespan of the following jobs on 3 machines. a) Compute Cmax(LPT) b) Pair the jobs 1-5, 2-6, 4-5, 7-8-9 • What is Cmax? • Is this Cmax(OPT)? Why? c) What is Cmax(LPT)/Cmax(OPT) ?
8 α = (д 1 9 2 5 3 4 5 10 3 6 7 86 9 10 2 7 10) 1 4 1 в = (1, 2 3 3 5 4 8 5 2 6 9 7 7 8 4 9 6 10 1 10) 10 8 ү 1 3 2 7 3 9 4 5 1 5 6 7 8 2 9 4 19) 10 1 ө ( 42 2 4 5 4 6 5 2 6 7...
Let U = (1, 2, 3, 4, 5, 6, 7, 8, 9, 10), A = (1, 3, 5, 7, 9), 8 (2, 4, 6, 8, 10), and C (1, 2, 3, 4, 5, 10). List the elements of each set. (Enter your answers using roster notation. Enter EMPTY or for the empty set.) (a) 4 {2, 4, 6, 8, 10) (Đ) 1 0 0 {2,4, 10) X (1) cuc {}
ao 10 -9 -8 -7 -6 -5 4 -2 - 2 3 4 $ 6 7 8 9 10 Write the standard equation for the hyperbola graphed above. Preview Points possible: 1 Unlimited attempts. Submit
1-3 42 5 4 2 -6 9 8 . find bases 2 6 9-1 9 7 *6. Given A- find bases for nul A and col A -1 3 -4 25 -4 Express your answers in parametric vector form. 16 points