Question

Using gross labour rates of R5,00 per hour for craftsmen and R2,00 per hour for labourers, and th...

Using gross labour rates of R5,00 per hour for craftsmen and R2,00 per hour for

labourers, and the prices of materials given below, work up the following rates:

1. Softwood in rafters 100mm × 50mm ...per linear metre.

2. (a) 25 mm close-jointed roof boarding and fixing

to flat roofs

(b) Raking, cutting on ditto

...per square metre.

3. 19mm cross tongued eaves soffit ...per linear metre.

4. 12,7mm insulation board, fixed to vertical stud

partition ...per square metre.

5. 22mm tongued and grooved floor boarding in

150mm widths, nails to joists ...per square metre.

6. 32mm × 150mm softwood skirting, on and

including 38mm × 19mm grounds, plugged to

brickwork

...per linear metre.

7. 25mm × 75mm hardwood architrave, plugged and

screwed to brickwork, including mitres ...per linear metre.

8. 38mm × 150mm hardwood window board tongue

at back to sill, on and including softwood bearers ...per linear metre.

9. 50mm softwood door, 1m × 2m in three panels, the upper panel 1800mm × 450mm open and rebated for glass with applied moulding one side, including hanging on butts (measured separately) ...per door.

10 State the labour constants you would use for fixing the following items:

(a) Standard internal door 0.8mm × 2,0m;

(b) Softwood window 0,9m × 1m;

(c) 25mm softwood shelving;

(d) Plugging to concentrate walls;

(e) Mortice lock to hardwood door;

(f) 13mm × 150mm bolt to roof timbers;

(g) 150mm × 100mm softwood purlins;

(h) 50mm woodwool slabs on flat roof.

_____________________________________________________________________________

Analysis of Builders' Prices / © ICG / Page 34

PRICES OF MATERIALS:

Carcassing timber – per cubic metre R48

Softwood for joinery – per cubic metre R54

Hardwood – per cubic metre R160

25mm roof boarding – per square metre R1,25

22mm tongued and grooved flooring – per square metre R1,35

Nails – per kg R0,25

12,7mm insulation board – per square meter R0,83

Prepare timber in door – cubic metre R80

0 0
Add a comment Improve this question Transcribed image text
Answer #1

9a CL 3 mRS , 300 夕 ng 39 Coen peete 9 Comp onentaict Ra -乂Soo 0 4eren COD鸟鸟요 소 Co Cons dex so Con s h。bu.foon

Add a comment
Know the answer?
Add Answer to:
Using gross labour rates of R5,00 per hour for craftsmen and R2,00 per hour for labourers, and th...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT