Oliver Company | ||||||
Quality cost report | ||||||
For the year ended December, 31 2015 | ||||||
Quality cost | Total Quality cost | Percentage of sales | ||||
Prevention cost | ||||||
Vendor certification | $647,900 | |||||
Design review | $117,800 | $765,700 | $1.30 | ($ 765700/58900000*100) | ||
Appraisal cost | ||||||
Test Labor | $1,649,200 | |||||
Inspection Labor | $1,472,500 | $3,121,700 | $5.30 | ($ 3121700/58900000*100) | ||
Internal Failure cost | ||||||
Retesting | 1649200 | |||||
Rework | 2532700 | 4181900 | $7.10 | ($ 4181900/58900000*100) | ||
External Faliure cost | ||||||
Consumer Complaints. | 1236900 | |||||
Warranty | 2238200 | 3475100 | $5.90 | ($3475100/58900000*100) | ||
Total Quality Cost | $11,544,400 | |||||
Kathy Shorts, president of Oliver Company, was concerned with the trend in sales and profitabilit...
Long-Term Performance Report Nabors Company had actual quality costs for the year ended June 30, 20x5, as given below. Prevention costs: Prototype inspection $ 380,000 Vendor certification 760,000 Total prevention costs $ 1,140,000 Appraisal costs: Process acceptance $ 395,000 Test labor 440,000 Total Appraisal costs $ 835,000 Internal failure costs: Retesting $ 227,500 Rework 455,000 Total internal failure costs $ 682,500 External failure costs: Recalls $ 232,000 Product liability 462,500 Total external failure costs $ 694,500 Total quality costs $3,352,000...
Marlene Briggs, president of Shorts Company, was concerned with the trend in sales and profitability. The company had been losing customers at an alarming rate. Furthermore, the company was barely breaking even. Investigation revealed that poor quality was at the root of the problem. At the end of 2013, Marlene decided to begin a quality improvement program. As a first step, she identified the following in the accounting records as quality related, in addition to the sales revenue: Sales (400,000...
Nabors Company had actual quality costs for the year ended June 30,20x5, as given below. Prevention costs: $ 350,000 Prototype inspection Vendor certification 700,000 $ 1,050.000 Total prevention costs Appraisal costs: Process acceptance $365,000 Test labor 410,000 Total Appraisal costs $ 775.000 Internal failure costs: Retesting $ 212,500 Rework 425,000 Total internal failure costs $ 637.500 External failure costs: Recalls $ 227.250 Product liability 515,750 Total external failure costs $ 743,000 Total quality costs $3,205,500 At the zero-defect state, Nabors...
Quality Cost Report Evans Company had total sales of $3,800,000 for fiscal 20x5. The costs of quality-related activities are given below. Returns/allowances $190,000 Design changes 228,000 Prototype inspection 11,400 Downtime 152,000 Quality circles 7,600 Packaging inspection 15,200 Field testing 7,600 Complaint adjustment 209,000 Required: 1. Prepare a quality cost report, classifying costs by category and expressing each category as a percentage of sales. Round percentages to one decimal place, when rounding is required. For example, 5.78% would be entered as...
Quality Cost Report Evans Company had total sales of $1,800,000 for fiscal 20x5. The costs of quality-related activities are given below. Returns/allowances $90,000 Design changes 72,000 Prototype inspection 3,600 Downtime 90,000 Quality circles 5,400 Packaging inspection 7,200 Field testing 5,400 Complaint adjustment 90,000 Required: 1. Prepare a quality cost report, classifying costs by category and expressing each category as a percentage of sales. Round percentages to one decimal place, when rounding is required. For example, 5.78% would be entered as...
Interim Quality Performance Report Davis, Inc., had the following quality costs for the years ended December 31, 20x4 and 20x5: 20x4 20x5 Prevention costs: Quality audits $60,000 $90,000 Vendor certification 119,500 179,250 Appraisal costs: Product acceptance $90,000 $135,000 Process acceptance 91,000 102,500 Internal failure costs: Retesting $96,000 $86,000 Rework 200,000 176,000 External failure costs: Recalls $142,500 $114,000 Warranty 330,000 314,000 At the end of 20x4, management decided to increase its investment in control costs by 50 percent for each category’s...
The following represents the financial information for Domingo Corporation for two months. March April $360,000 Sales revenue $540,000 Costs $ 1,550 1,820 Process inspection 1,940 1,870 13,300 Scrap Quality training Warranty repairs Product testing equipment Customer complaints 20,600 4,300 6,700 2,500 16,000 15,100 6,400 9,800 4,800 7,500 3,100 20,000 9,400 4,700 Rework Preventive maintenance Materials inspection Field testing 13,500 Required: a. Classify these items into Prevention, Appraisal, Internal failure, or External failure costs. b. Calculate the ratio of the prevention,...
Evans Company had total sales of $4,000,000 for fiscal 20x5. The costs of quality-related activities are given below. S280,000 160.000 Returns/allowances Design changes Prototype inspection Downtime Quality circles 8.000 300,000 16,000 12.000 Packaging inspection Field testing Complaint adjustment 12,000 280,000 Required: 1. Prepare a quality cost report, classifying costs by category and expressing each category as a percentage of sales. Round percentages to one decimal place, when rounding is required. For example, 5.78% would be entered as "5.8", Evans Company...
Trend, Long-Range Performance Report In 20x4, Tru-Delite Frozen Desserts, Inc., instituted a quality improvement program. At the end of 20x5, the management of the corporation requested a report to show the amount saved by the measures taken during the year. The actual sales and quality costs for 20x4 and 20x5 are as follows: 20x4 20x5 Sales $600,000 $600,000 Scrap 15,000 15,000 Rework 20,000 10,000 Training program 5,000 6,000 Consumer complaints 10,000 5,000 Lost sales, incorrect labeling 8,000 0 Test labor...
Required A Required B Calculate the ratio of the prevention, appraisal, internal failure, and external failure costs to sales for March and April. (Enter your answers as a percentage rounded to 1 decimal place (i.e., 32.1).) March April Prevention Appraisal Internal failure External failure % % % % % % % % The following represents the financial information for Domingo Corporation for two months. March $515,000 April $440,000 Sales revenue Costs Process inspection Scrap Quality training Warranty repairs Product testing...