5. What is an optimal hedge and how do we calculate it? How do we decide if we should implement the hedge? Why?
I) Optimal hedge is a optimal contracts, contracts that are highly correlated with underlying assets and who have similar variance.
It is used to make investment to reduce the risk of adverse price movement on underlying assets by creating offsetting position.
II) Optimal hedge ratio is also called as minimum variance hedge ratio.
Optimal hedge ratio= p. * (S. D. Of Spot rate / S. D. Of futures rate)
Here, p. = correlation, S. D. = Standard deviation
Now, optimal hedge ratio is used to calculated optimal contracts
Optimal contracts = Optimal hedge ratio * (Portfolio size / Contract size of futures contract)
III) Hedge should be implemented using hedge ratio. This does not completely remove all risk of investments and hence hedge can be done on the basis of investors own tolerance level of risk.
5. What is an optimal hedge and how do we calculate it? How do we decide if we should implement t...
1. what are the basic types of hedge transactions? how do they differ from each other? 2. what does "Net Settlement" mean? 3. Criticize the following statement: "Exchange losses arise from foreign import activities, and exchange gains arise from foreign export activities" 4. what are foreign currency commitments? why are they considered special? 5. explain the circumstances under which fair value hedge accounting should be used and when cash-flow hedge accounting should be used
Faith Integration Assignment 5 - Vocation What do we mean by having a calling or being called? What is the difference between a calling and employment or a career? What types of vocations do we traditionally think of when we talk about being called? Why? Is it appropriate to be called to other careers? How does this work? What does this look like? How should you decide upon a vocation?
How do the conservatives, liberals and radicals believe that the optimal rate of pollution should be determined? How does each group believe firms should be forced to comply with the optimal rate of pollution? No cursive please
You are the treasurer of Montana Corp. and must decide how to hedge (if at all) future payables of 1 million Japanese yen 90 days from now. Call options are available with a premium of $.0004 per unit and an exercise price of $.01040 per Japanese yen. The forecasted spot rate of the Japanese yen in 90 days is $0.01043 with probability 30%, $0.01042 with probability 25%, $0.01039 with probability 25%, and $0.01038 with probability 20%. What is the probability...
5. What do we mean by the term "heteroskedasticity"? Describe the consequences of heteroskedasticity for estimation and inference within the context of the classical linear regression model. How can we detect the presence of heteroskedasticity? Be specific. Should anything be done about heteroskedasticity if it is detected? If so, what should be done? Be specific. If not, why not? 5. What do we mean by the term "heteroskedasticity"? Describe the consequences of heteroskedasticity for estimation and inference within the context...
5. What do we mean by the term "heteroskedasticity"? Describe the consequences of heteroskedasticity for estimation and inference within the context of the classical linear regression model. How can we detect the presence of heteroskedasticity? Be specific. Should anything be done about heteroskedasticity if it is detected? If so, what should be done? Be specific. If not, why not? 5. What do we mean by the term "heteroskedasticity"? Describe the consequences of heteroskedasticity for estimation and inference within the context...
How do we decide when to display situational ethnicity? a. We follow our families’ demands. b. We decide based on the holiday. c. We do a cost-benefit analysis. d. We only consider religious holidays.
What are the arguments against a MNC hedging transaction exposure? Why should companies not hedge?
You own a bond portfolio and decide to hedge using futures on 10 year Treasury notes. The bond portfolio has a PVBP = $764.9 and the futures contract has a PVBP = $193.1. What is the hedge ratio needed? Enter your result as a positive number with one decimal place (do not round to the nearest integer).
Question 2 (5 marks) In class, we discussed how to implement static scoping using a static chain. We discussed how to use the static chain to access a variable we want to update at runtime. What we did not discuss is how to maintain this static chain when we make recursive calls. Your task in this question is to provide the details of computing the static link for a function that is being called, that is, how to find the...