Question

Consider the two-bus lossless system shown in Figure Q6. The cost functions of the generators connected at buses A and B are,

0 0
Add a comment Improve this question Transcribed image text
Answer #1

C-S PS 1400 7n

Add a comment
Answer #2

source: uni
answered by: anonymous
Add a comment
Know the answer?
Add Answer to:
Consider the two-bus lossless system shown in Figure Q6. The cost functions of the generators con...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 5.2 Consider the two-bus power system shown in Figure P5.2. The marginal cost of production of th...

    5.2 Consider the two-bus power system shown in Figure P5.2. The marginal cost of production of the generators connected to buses A and Baseie.br n, respectively,by the following expressions: MCA 20+0.03PA ($/MWh) MCB 15+0.02PB ($/MWh) Assume that the demand is constant and insensitive to price and that energy is sold at its marginal cost of production and that there are no limits on the output of the generators. Calculate the price of electricity at each bus, the production of each...

  • ion and Question 5 Marks: 30 Show all the derivations when applicable. Consider the production of...

    ion and Question 5 Marks: 30 Show all the derivations when applicable. Consider the production of the generators equations: two-bus power system shown in the Figure 1. The cost function of connected to buses A and B are given by the following Generator A: C-180 + 20P4 + 0.015 Generator B: C 210 +15Pp +0.01P Pa DA -2000 Mw Da-1000 Mw Figure I: Two-bus power system. Assume that the demand is constant marginal cost of production and that there are...

  • The six-bus system shown in Figure 1 will be simulated using MATLAB. Transmission line data and b...

    The six-bus system shown in Figure 1 will be simulated using MATLAB. Transmission line data and bus data are given in Tables 1 and 2 respectively. The transmission line data are calculated on 100 MVA base and 230 (line-to-line) kV base for generator. Tasks: 1. Determine the network admittance matrix Y 2. Find the load flow solution using Gauss-Seidel/Newton Raphson method until first iteration by manual calculation. Use Maltab software to solve power flow problem using Gauss-Seidel method. Find the...

  • Qustion 2.120 marks) a) Figure I below shows a system with plant-I and plant-2 connected to bus-1 and bus-2 respectively. There are two loads and 3 branches. The bus-I is the reference bus with 1...

    Qustion 2.120 marks) a) Figure I below shows a system with plant-I and plant-2 connected to bus-1 and bus-2 respectively. There are two loads and 3 branches. The bus-I is the reference bus with 1.040° pu voltage. Base MVA is 100 If the branch currents and branch impedance values are as follows -2.5-j0.50pu -2-j040 pu I 1.5-j0.3 pu Calculate: 7-0.05+j0.20 pu -0.02+j0.08 pu Z 0.025+j0.10 pu i. Current distribution factors (4 marks) ii. Power factor angles at bus 1 and...

  • Figure 1 shows the one line diagram of a simple power system. Generators are connected at...

    Figure 1 shows the one line diagram of a simple power system. Generators are connected at buses 1 and 3 while the loads are indicated at all five buses. Base values for transmission system are 100 MVA, 138 kV. The line data of Table 1 gives per unit series impedances and the charging MVar accounting for the distributed capacitance of the 5 lines. The bus data in Table 2 list values for P, Q and Vat each bus. The slack...

  • A power system has two generators with the following total cost functions: Generator A: TCA =...

    A power system has two generators with the following total cost functions: Generator A: TCA = 5QA + QA2 Generator B: TCB = 30QB In the total cost functions, Q represents generator output. You may assume that the generators have no capacity constraints. Suppose that electricity demand during some hour was 10 MWh and that the utility running the power system uses economic dispatch to meet demand. Calculate the output for Generator B under economic dispatch.

  • Consider the single line diagram of a 3-bus power system shown in Figure 2. Slack bus...

    Consider the single line diagram of a 3-bus power system shown in Figure 2. Slack bus 3 Figure 2. The data for this system are given in Tables 1 and 2. Bus Table 1 Generation Load Assumed PG QGPLQL bus voltage (MW) (MVar) (MW) (MVar) 1.05 +10.0 - - 1.0 + 0.0 50 30 305.6 140.2 1.0 +0.0 0.0 0.0 138.6 45.2 slack bus) Table 2 Bus-to-bus Impedance 0.2 + j0.04 .01 +0.03 2.3 0.0125 + j0.025 (0) Convert all...

  • The one-line diagram of a three-bus power system is shown in Figure 4. All impedances are...

    The one-line diagram of a three-bus power system is shown in Figure 4. All impedances are expressed in per unit on a common MVA base. All resistances and shunt capacitances are neglected. Information on each component in this system is given below: • Each generator is represented by an emf behind the sub-transient reactance of j0.045 and their neutrals are connected to the ground. • Line 1-2 has reactance of j0.88 • Line 2-3 has reactance of j0.65 • Line...

  • A two bus segment that is part of a larger power network is shown in figure 3. The reactance of the line connecting the...

    A two bus segment that is part of a larger power network is shown in figure 3. The reactance of the line connecting the buses is 0.05 per unit; the resistance of the line can be ignored. Phasor measurement units (PMU«) are attached to each bus in order to calculate the power flow between these buses = 0.97/46°, with amplitude given in per A PMU at bus A calculates a phasor voltage as Va unit. A PMU at bus B...

  • For the radial distribution system shown in the figure below, the impedances of the two line sect...

    For the radial distribution system shown in the figure below, the impedances of the two line sections and the equivalent generator are given in pu. Consider symmetrical faults only (three-phase, positive sequence) and assume that the relay at bus A is set to pickup for a fault at bus C. The relay at bus B is set to pickup at one half of that value. 2) Assume there is a DER installed at bus C whose fault current contribution is...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT