Question

The valve shown is the type used in the control of water in large conduits. Model tests are to be done, using 20oC water as the fluid in both the model and the prototype, to determine how the valve will operate under wide-open conditions. The prototype size is 2 m in diameter at the inlet and the model inlet diameter is 0.5 m. What flow rate is required for the model if the prototype flow rate is 15 m3 /s?3. The valve shown in the figure below is the type used in the control of water in large conduits. Model tests are to be done

0 0
Add a comment Improve this question Transcribed image text
Answer #1

SoladtionModet Podtotube Dinlet 0.3 m T 15 c No value in gven fur velo y Ao totyhe ppe Vpnotype Omod 1 고 且model Rp 0 a 0 2.

Add a comment
Know the answer?
Add Answer to:
The valve shown is the type used in the control of water in large conduits. Model tests are to be done, using 20oC water as the fluid in both the model and the prototype, to determine how the valve wi...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Model tests are to be performed to study the flow through a large valve having a...

    Model tests are to be performed to study the flow through a large valve having a 2-ft-diameter inlet and carrying water at a volume flow rate of 30 cfs. The working fluid in the model is water at the same temperature as that in the prototype. Complete geometric similarity exists between model and prototype, and the model inlet diameter is 3 in. Determine the required volume flow rate in the model. 3.75 cfs 1.875 cfs 7.5 cfs 0.9 cfs

  • 5. Model tests are to be performed to study the flow through a large valve having...

    5. Model tests are to be performed to study the flow through a large valve having a 2-ft-diameter inlet and carrying water at a flowrate of 30 cfs. The working fluid in the model is water at the same temperature as that in the prototype. Complete geometric similarity exists between model and prototype. , and the model inlet diameter is 3 in. Determine the required flowrate in the model

  • 1/9 1 Piping system (14 points) Water is pumped from a reservoir to a large receiver...

    1/9 1 Piping system (14 points) Water is pumped from a reservoir to a large receiver vessel which is maintained at p4 6 bar (absolute) through the operation of the pump and a high pressure nitrogen supply that bleeds into the tank through a regulator. The water enters through an opening at the top of the vessel. A drain is provided at the low point in the system. Elevations are as shown. All valves are gate valves (k = 0.15)...

  • 1/9 1 Piping system (14 points) Water is pumped from a reservoir to a large receiver...

    1/9 1 Piping system (14 points) Water is pumped from a reservoir to a large receiver vessel which is maintained at p4 6 bar (absolute) through the operation of the pump and a high pressure nitrogen supply that bleeds into the tank through a regulator. The water enters through an opening at the top of the vessel. A drain is provided at the low point in the system. Elevations are as shown. All valves are gate valves (k = 0.15)...

  • phlebotomy 166 Unit Ill: Blood Collection Procedures MATCHING 9-4: SCENARIOS AND VASCULAR ACCESS DEVICES e type...

    phlebotomy 166 Unit Ill: Blood Collection Procedures MATCHING 9-4: SCENARIOS AND VASCULAR ACCESS DEVICES e type of equipment described in the following scenaries with the list of vascular access devices. Scenarios Vascular Access Devices A nurse is collecting a blood gas specimen A. Arterial line (A-line) from tubing inserted in the underside of a B. Arteriovenous (AV) shunt patient's left wrist on the thumb side. C. Central venous catheter (CVC) D. Implanted port A nurse is palpating an area in...

  • summarizr the followung info and write them in your own words and break them into different...

    summarizr the followung info and write them in your own words and break them into different key points.   6.5 Metering Chamber: 6.5.1 The minimum size of the metering box is governed by the metering area required to obtain a representative test area for the specimen (see 7.2) and for maintenance of reasonable test accuracy. For example, for specimens incorporating air spaces or stud spaces, the metering area shall span an integral number of spaces (see 5.5). The depth of...

  • summatize the following info and break them into differeng key points. write them in yojr own...

    summatize the following info and break them into differeng key points. write them in yojr own words   apartus 6.1 Introduction—The design of a successful hot box appa- ratus is influenced by many factors. Before beginning the design of an apparatus meeting this standard, the designer shall review the discussion on the limitations and accuracy, Section 13, discussions of the energy flows in a hot box, Annex A2, the metering box wall loss flow, Annex A3, and flanking loss, Annex...

  • 10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated...

    10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated sludge operation that adversely affect effluent quality with origins in the engineering, hydraulic and microbiological components of the process. The real "heart" of the activated sludge system is the development and maintenance of a mixed microbial culture (activated sludge) that treats wastewater and which can be managed. One definition of a wastewater treatment plant operator is a "bug farmer", one who controls the aeration...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT