survey 1
survey 1
survey 1 survey 1 Question three is marko Calculate the Cumulative volume (ydī) after-calculating the volume of c of fill (yd), and adjusted volume of fill (yd'), using the End arca me...
4. Section Method (4 points) Using the section method (the average end area method), determine the required volume of the cuts and fills for a new road. The cuts and fills for each station are shown in Table below Express your answer in cubic yards. Cut (sf) Fill (sf 120 100 Station 1+00 1+50 2+00 2+50 3+00 3+40 145 120 80 50 400 The material in this problem has a shrinkage of 94 percent and a swell of 25 percent....
This is a transportation engineering problem. Help me solve number one. Thank you. ll tB the Assignments section of the Syl Homework should be an individual effort though discussion is permissible abbus. 1. (5 points) For the data listed, tabulate cut, nill, and cumulative volumes in cubic yards between stations 10 + 00 and 20+ 00. Use an expanston factor of 1.25 for fills. Prepare a Mass Haul Dia with free haul equivalent to 500 feet and overhaul cost gram....
Part 2 Based upon the results to part 1, the project requires hauling materials to, or from, the site. The following equipment is available for earthwork operations: - One 5-cy heaped capacity bucket loader; a 0.5 min cycle time; 90% fill capacity. - One 7-cy heaped capacity bucket loader; a 0.6 min cycle time; 90% fill capacity. 45.9-cy heaped capacity off-road trucks; a 0.5 min dump time; 100% fill capacity. - Loaded trucks travel through the following three sections: Haul...
Part 1 Complete the following Earthwork Sheet Material: Earth and Gravel, Swell Factor: 83 Strip fill(cy Total till och Total cut beyl Adj fill (byl Sum (beyl Mass ordinate 1.23 056 2.37 1.20 2.36 3.07 3.60 3.77 3.09 3.01 4.65 Strip cut (boyil 0.04 1.04 097 3.22 2.08 2.33 2.51 1.85 161 1.74 0.88 109 35.70 5.58 18 3.12 2.03 6.77 2.01 2.53 0.82 1.08 1.20 1.92 1.59 1.82 3.95 3.25 2.74 150 7.42 556 80 End-area End area cut...
pleas help me in this do any question you know using National Electrical Code 2011 Applied Electricity NEC worksheet t hree Copper conductors with THHN insulation run in Electrical A branch-circuit Consther conductors. The conductor terminations are rated for a maximum ure in the area of this installation is not expected to exceed 30C size 8 AWG, the maximum ampacity of the conductors If the conductors for this circuit are permitted A 40 amperes. B. 50 amperes. to be used...
. Required Question: 1. Should Matt try to suggest a better method for reducing purchasing costs? (200 words) 3. How can Matt find out more information about the suppliers in a short period of time? (200 words) 3. what are his internal or external resources that he should consider? Custom Equipment It was July 2, and Mat Roberts had just been given his robots/weldguns, affiliate-produced parts/fabricated com- first assignment, te Wire Management Program" ponents, and steel/other metals. Matt was hired...
CASE 1-5 Financial Statement Ratio Computation Refer to Campbell Soup Company's financial Campbell Soup statements in Appendix A. Required: Compute the following ratios for Year 11. Liquidity ratios: Asset utilization ratios:* a. Current ratio n. Cash turnover b. Acid-test ratio 0. Accounts receivable turnover c. Days to sell inventory p. Inventory turnover d. Collection period 4. Working capital turnover Capital structure and solvency ratios: 1. Fixed assets turnover e. Total debt to total equity s. Total assets turnover f. Long-term...
A. Issues [1] In addition to damages for one year's notice period, can a trial judge award significant damages for the mere fact of an employee's dismissal, or for the stigma that that dismissal brings? Or for the employer thereafter competing with the ex-employee for the clients, before the ex-employee has got a new job? B. Basic Facts [2] This is an appeal from 2009 ABQB 591 (CanLII), 473 A.R. 254. [3] Usually a judgment recites facts before law. But...