A well was drilled and based on the driller's log, you constructed the vertical profile shown in the figure below. Water was first encountered at 12 m; ultimately, the well was screened betwee...
A well was drilled and based on the driller's log, you constructed the vertical profile shown in the figure below. Water was first encountered at 12 m; ultimately, the well was screened between 17 and 27 meters. Your boss now wants you to design a pump test. Please state briefly your approaches: e.g, what kind of data you need collect during the pump test? What kinds of aquifer properties you may estimate ed on your pump test? How to estimate these properties based on this aquifer. If your boss wants to have a drawdown of 1 meter over the first 6 hours of the test in an observation well located 150 m from the pumping well, at what rate would you pump (this would give you some information on what type of pump you need acquire)? Land surface 0.0 m Coarse sand 15.0 m 17.0 m Fine silt Loarse sand 27.0 m Bedrock
A well was drilled and based on the driller's log, you constructed the vertical profile shown in the figure below. Water was first encountered at 12 m; ultimately, the well was screened between 17 and 27 meters. Your boss now wants you to design a pump test. Please state briefly your approaches: e.g, what kind of data you need collect during the pump test? What kinds of aquifer properties you may estimate ed on your pump test? How to estimate these properties based on this aquifer. If your boss wants to have a drawdown of 1 meter over the first 6 hours of the test in an observation well located 150 m from the pumping well, at what rate would you pump (this would give you some information on what type of pump you need acquire)? Land surface 0.0 m Coarse sand 15.0 m 17.0 m Fine silt Loarse sand 27.0 m Bedrock