roints (a) A supplier wants to use a rectifying inspection plan to improve the incingt 10000 mechanical components. The fraction nonconform outgoing lot of ing lot is0.01. A single inspection sam...
roints (a) A supplier wants to use a rectifying inspection plan to improve the incingt 10000 mechanical components. The fraction nonconform outgoing lot of ing lot is0.01. A single inspection sampling plan with sample size of 75 and acceptance tquality plan. Do you think the rectifying inspection plan will improve justify your answer with evidence. (b) A multiple-sampling number of zero is used in the inspection the quality of the outgoing lot?- pling plan is presented in the following table. During the inspection of a lot, the umbers of defective items found in the five stages are equal to 2, 1, 1,2 rejected?-support your answer with evidence. ac Stage Sample size Acceptance number Rejection number 0 20 20 20 20 4 5 20
roints (a) A supplier wants to use a rectifying inspection plan to improve the incingt 10000 mechanical components. The fraction nonconform outgoing lot of ing lot is0.01. A single inspection sampling plan with sample size of 75 and acceptance tquality plan. Do you think the rectifying inspection plan will improve justify your answer with evidence. (b) A multiple-sampling number of zero is used in the inspection the quality of the outgoing lot?- pling plan is presented in the following table. During the inspection of a lot, the umbers of defective items found in the five stages are equal to 2, 1, 1,2 rejected?-support your answer with evidence. ac Stage Sample size Acceptance number Rejection number 0 20 20 20 20 4 5 20