Question

. How is a cast-in-place concrete structural frame installed? 2. How are bolted connection made during the construction of a
0 0
Add a comment Improve this question Transcribed image text
Answer #1

1. step 1 : After foundation Casting of members of frame i.e. beam and columns on site.

step 2 : Firstly install the columns and beams and frames are designed to retain gravity and lateral load so members should be rigid and the connection should also be rigid.

step3 : After step 2 casted slab is then attached to the panel of beams and columns.

And after that all other members and facilities are also provided.

Add a comment
Know the answer?
Add Answer to:
. How is a cast-in-place concrete structural frame installed? 2. How are bolted connection made during the construction of a steel framed building? 3. What construction methods are used if bedroc...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
Active Questions
ADVERTISEMENT