Please fill out the chart using the information below:

Thunderduck Custom Tables, Inc. Thunderduck Custom Tables, Inc. Income Statement uck Schedule of cost of goods manufactured F

Step 1 You work for Thunderduck Custom Tables Inc. This is the first month of operations. The company designs and manufactures specialty tables. Each table is specially customized for the customer. This month, you have been asked to develop and manufacture two new tables for customers. You will design and build the tables. This is a no nail, no screw, and no glue manufacturing ( no indirect materials used). You will be keeping track of the costs incurred to manufacture the tables using Job #1 Cost Sheet and Job #2 Cost Sheet.
The cost of the direct materials that can be used to manufacture the table are as follows. These cost are on a per unit basis.
Table Top $2,900.00
Table Leg $1,100.00
Drawer   $490.00
The company uses a job order costing system and applies manufacturing overhead to jobs based on direct labor hours.   
The company estimates that there will be 12 direct labor hours worked during the month.
The estimated manufacturing overhead cost for the month is:
a. Factory supervisor salary per month $4,500.00
b. Rent for the factory per month $1,500.00
c. Depreciation of factory equipment per month $600.00
Total Estimated manufacturing overhead $6,600.00
What is the predetermined manufacturing overhead rate?     
Step 2 The first order you received was to manufacture a table using a table top and four legs. This is your Job #1.
Step 3 The customer that has ordered Job #2, wants a table that is the same as Job #1, but wants to also add a drawer to the table.
Step 4 The following is a list of transactions that need to be recorded for the company for activity in the month of December. Record those in the "General Journal" tab of the excel file using the proper format. Please use the following accounts: Accounts Receivables, Raw materials, Work in process, Finished goods, Accumulated depreciation, Accounts payable, Salaries and wages payable, Sales revenue, Manufacturing overhead, Cost of goods sold, Salaries and wages expense, Advertising expenses, and Depreciation expense.
1-Dec Raw Materials purchased on account, $29,000.
5-Dec All Raw Materials needed for Job #1 were requisitioned from the material storage for use during the month. Assume all materials are direct. (After you journalize this entry please enter the information into Job #1 Cost Sheet)
10-Dec The following employee costs were incurred but not paid during the month:
There are three assembly employees that spend 2 hours each, $35 per hour to make the table for Job #1. (After you journalize this entry please enter the information into Job #1 Cost Sheet)
Salary for supervisor of the factory $5,000.
Administrative Salary $2,000.
15-Dec All Raw Materials needed for Job #2 were requisitioned from the material storage for use during the month. Assume all materials are direct. (After you journalize this entry please enter the information into Job #2 Cost Sheet)
16-Dec Rent for the month of December for the factory building incurred but not paid $1,500.
17-Dec Advertising costs incurred but not paid for the month was $1,400.
20-Dec Depreciation for the month of December was recorded on equipment was $750 ($150 for equipment used in the factory and the remainder for equipment used in selling and administrative activities).
22-Dec Manufacturing overhead cost was applied based on direct labor hours to Job #1 based on the POHR determined on the "Job Cost Sheet". (After you journalize this entry please enter the information into Job #1 Cost Sheet)
26-Dec Job #1 was completed and transferred to Finished Goods during the month.
28-Dec The completed table from Job #1 was sold on account to the customer for $34,000 during the month. (Hint: Make sure to account for the cost of the table that was sold using the cost from the job cost sheet.)
31-Dec Direct labor cost incurred but not paid for three employees to start manufacturing Job #2. The employees only worked one hour each, three hours total, $35 per hour during the month and they did not complete their work on the job. (After you journalize this entry please enter the information into Job #2 Cost Sheet)
31-Dec Manufacturing overhead cost was applied based on direct labor hours to Job #2 based on the POHR. Only three direct labor hours were worked on Job #2 during the month. (After you journalize this entry please enter the information into Job #2 Cost Sheet)
31-Dec Any underapplied or overapplied overhead for the month was closed out to Cost of Goods Sold.
Step 5 Post the journal entries that you recorded on the "General Journal" tab to the "T-accounts" tab. This is the company's first month of business, so there will not be any beginning balances. Compute the balance for each T-account after all of the entries have been posted.
Step 6 Prepare a Schedule of Cost of Goods Manufactured and a Schedule of Cost of Goods Sold on the "Schedule of COGM and COGS" tab for Job #1 and Job #2 that were worked on during the month by the company. Make sure to follow the format noted in your book (pg. 87). (Hint: This is the company's first month of operations and therefore the beginning balances will be zero.)
Step 7 Prepare an Income Statement for the month using the Traditional Format on the "Income Statement" tab.  

Journal Entries

Date Particulars Dr. Amount Cr. Amount
Dec-01 Raw Materials $29,000
Accounts Payable $29,000
Dec-05 Work in Process $7,300
Raw Materials $7,300
Dec-10 Work in Process $210
Manufacturing Overhead $5,000
Salaries & Wages Expense $2,000
Salaries & Wages Payable $7,210
Dec-15 Work in Process $7,790
Raw Materials $7,790
Dec-16 Manufacturing Overhead $1,500
Accounts Payable $1,500
Dec-17 Advertising Expenses $1,400
Accounts Payable $1,400
Dec-20 Manufacturing Overhead $150
Depreciation expense $600
Accumulated depreciation $750
Dec-22 Work in Process $3,300
Manufacturing Overhead $3,300
Dec-26 Finished Goods $10,810
Work in Process $10,810
Dec-28 Accounts Receivable $34,000
Sales Revenue $34,000
Dec-28 Cost of Goods Sold $10,810
Finished Goods $10,810
Dec-31 Work in Process $105
Salaries & Wages Payable $105
Dec-31 Work in Process $1,650
Manufacturing Overhead $1,650
Dec-31 Cost of Goods Sold $5,700
Manufacturing Overhead $1,700
Salaries & Wages Expense $2,000
Advertising Expenses $1,400
Depreciation expense $600
0 0
Add a comment Improve this question Transcribed image text
Answer #1
Step 1 Determination of the predetermined Manufacturing overhead rate :-
Predetermined Manufacturing Overhead Rate = Total estimated manufacturing overhead cost = $6,600 = $550 per direct labour hour
Total estimated direct labor hours 12
Step 2 The first order you received was to manufacture a table using a table top and four legs. This is your Job #1 :-
Job #1 Cost Sheet
Total
Direct Materials
Table Top                                                                        2,900
Table Leg                                                                        1,100                   4,000
Direct Labor 2 hours* 3 employees= 6 hours *$35 per hour                      210
Manufacturing Overhead $550* 6 hours                   3,300
Total                   7,510
Step 3 The customer that has ordered Job #2, wants a table that is the same as Job #1, but wants to also add a drawer to the table. :-
Job #2 Cost Sheet
Total
Direct Materials
Table Top                                                                        2,900
Table Leg                                                                        1,100
Drawer                                                                           490                   4,490
Direct Labor 1 hours* 3 employees= 3 hours *$35 per hour                      105
Manufacturing Overhead $550* 3 hours                   1,650
Total                   6,245
Step 4 Journal entries
Sr. No. Particulars L.F Debit Credit
1-Dec Raw Materials A/c    Dr. $29,000
           To Accounts payable A/c $29,000
(Being Raw materials purchased on account)
5-Dec Work in Process A/c                             Dr. $     4,000
            To Raw Materials A/c $4,000
(Being Raw materials issued for use in Job #1)
10-Dec Work in Process A/c      (2 hours* 3 employees*$35 per hour)    Dr.            210
Manufacturing Overheads A/c                                                         Dr. $5,000
Selling & Administration Overheads A/c                                          Dr. $2,000
           To Salaries and wages payable A/c                   7,210
(Being employee cost incurred)
15-Dec Work in Process A/c                                             Dr. $4,490
            To Raw Materials A/c $4,490
(Being Raw materials issued for use in Job #2)
16-Dec Manufacturing Overheads A/c   Dr. $1,500
           To Rent Payable A/c $1,500
(Being Rent for the factory building incurred )
17-Dec Selling & Administration Overheads A/c   Dr. $1,400
           To Advertising Expenses Payable A/c $1,400
(Being Advertising Expenses incurred)
20-Dec Manufacturing Overheads A/c                         Dr. $150
Selling & Administration Overheads A/c                                                  Dr. $600
           To Accumulated depreciation A/c $750
(Being depreciation charged on factory and office equipments)
22-Dec Work in Process A/c                                                                       Dr.         3,300
           To Manufacturing Overheads A/c   $3,300
(Being Manufacturing Overheads charged to job #1 @ $550 per direct labour) (550 * 6)
26-Dec Finished Goods A/c                                                                        Dr.         7,510
           To Work in Process A/c $7,510
(Being job #1 completed)
28-Dec Cost of goods sold A/c                                                                   Dr. $7,510
           To Finished Goods A/c $7,510
(Being goods sold transferred)
28-Dec Account Receivable A/c                                                                                        Dr. $34,000
           To Sales Revenue A/c $34,000
(Being goods sold on account)
31-Dec Work in Process A/c     (1 hour* 3 employees*$35 per hour)    Dr. $105
           To Salaries and wages payable A/c $105
(Being direct labor cost incurred)
31-Dec Work in Process A/c                                                                     Dr. $1,650
           To Manufacturing Overheads A/c   $1,650
(Being Manufacturing Overheads charged to job #2 @ $550 per direct labour) (550 * 3)
31-Dec Cost of goods sold A/c                                                                   Dr. $     1,700
           To Manufacturing Overheads A/c   $1,700
(Being underapplied overheads charged)


Step 5 I-Accounts Raw materials Alc To Balance bld By Work in Process 8,490 To Accounts payable Alc $ 29,000 By Balance dd 20Cost of Goods Sold Alc To Finished Goods Atc $7,510 By Sales Revenue A/c 9,210 To Manufacturing Overheads Alc $1.7010 $ 9.210 Feel free to ask any clarification, if required. Please provide feedback by thumbs up, if satisfied. It will be highly appreciated. Thank you
.

Add a comment
Know the answer?
Add Answer to:
Please fill out the chart using the information below: Step 1 You work for Thunderduck Custom Tables Inc. This is th...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Step 1 You work for Thunderduck Custom Tables Inc. This is the first month of operations....

    Step 1 You work for Thunderduck Custom Tables Inc. This is the first month of operations. The company designs and manufactures specialty tables. Each table is specially customized for the customer. This month, you have been asked to develop and manufacture two new tables for customers. You will design and build the tables. This is a no nail, no screw, and no glue manufacturing (no indirect materials used). You will be keeping track of the costs incurred to manufacture the...

  • QUESTION 1 Step 1 You work for Thunderduck Custom Tables Inc. This is the first month...

    QUESTION 1 Step 1 You work for Thunderduck Custom Tables Inc. This is the first month of operations. The company designs and manufactures specialty tables. Each table is specially customized for the customer. This month, you have been asked to develop and manufacture two new tables for customers. You will design and build the tables. This is a no nail, no screw, and no glue manufacturing (no indirect materials used). You will be keeping track of the costs incurred to...

  • Step 1 You work for Thunderduck Custom Tables Inc. This is the first month of operations....

    Step 1 You work for Thunderduck Custom Tables Inc. This is the first month of operations. The company designs and manufactures specialty tables. Each table is specially customized for the customer. This month, you have been asked to develop and manufacture two new tables for customers. You will design and build the tables. This is a no nail, no screw. and no glue manufacturing (no indirect materials used). You will be keeping track of the costs incurred to manufacture the...

  • Job Cost Project-Accounting 2302 Need ASAP. Please help. Step 1 You work for Thunderduck Custom Tables...

    Job Cost Project-Accounting 2302 Need ASAP. Please help. Step 1 You work for Thunderduck Custom Tables Inc. This is the first month of operations. The company designs and manufactures specialty tables. Each table is specially customized for the customer. This month. you have been asked to develop and manufacture two new tables for customers. You will design and build the tables. This is a no nail, no screw. and no glue manufacturing (no indirect materials used). You will be keeping...

  • You work for Thunderduck Custom Tables Inc. This is the first month of operations. The company...

    You work for Thunderduck Custom Tables Inc. This is the first month of operations. The company designs and manufactures specialty tables. Each table is specially customized for the customer. This month, you have been asked to develop and manufacture two new tables for customers. You will design and build the tables. This is a no nail, no screw, and no glue manufacturing ( no indirect materials used). You will be keeping track of the costs incurred to manufacture the tables...

  • Step 1 You work for Thunderduck Custom Tables Inc. This is the first month of operations....

    Step 1 You work for Thunderduck Custom Tables Inc. This is the first month of operations. The company designs and manufactures specialty tables. Each table is specially customized for the customer. This month, you have been asked to develop and manufacture two new tables for customers. You will design and build the tables. This is a no nail, no screw, and no glue manufacturing ( no indirect materials used). You will be keeping track of the costs incurred to manufacture...

  • Step 1 You work for Thunderduck Custom Tables Inc. This is the first month of operations....

    Step 1 You work for Thunderduck Custom Tables Inc. This is the first month of operations. The company designs and manufactures specialty tables. Each table is specially customized for the customer. This month, you have been asked to develop and manufacture two new tables for customers. You will design and build the tables. This is a no nail, no screw, and no glue manufacturing ( no indirect materials used). You will be keeping track of the costs incurred to manufacture...

  • Step 1 You work for Thunderduck Custom Tables Inc. This is the first month of operations....

    Step 1 You work for Thunderduck Custom Tables Inc. This is the first month of operations. The company designs and manufactures specialty tables. Each table is specially customized for the customer. This month, you have been asked to develop and manufacture two new tables for customers. You will design and build the tables. This is a no nail, no screw, and no glue manufacturing ( no indirect materials used). You will be keeping track of the costs incurred to manufacture...

  • Step 1 You work for Thunderduck Custom Tables Inc. This is the first month of operations....

    Step 1 You work for Thunderduck Custom Tables Inc. This is the first month of operations. The company designs and manufactures specialty tables. Each table is specially customized for the customer. This month, you have been asked to develop and manufacture two new tables for customers. You will design and build the tables. This is a no nail, no screw, and no glue manufacturing ( no indirect materials used). You will be keeping track of the costs incurred to manufacture...

  • can you please answer step1-8. Step 1 You work for Thunderduck Custom Tables Inc. This is...

    can you please answer step1-8. Step 1 You work for Thunderduck Custom Tables Inc. This is the first month of operations. The company designs and manufactures specialty tables. Each table is specially customized for the customer. This month, you have been asked to develop and manufacture two new tables for customers. You will design and build the tables. This is a no nail, no screw, and no glue manufacturing (no indirect materials used). You will be keeping track of the...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT