b) Linear program is following:
Max 100X11+125X12+115X13+100X14+120X21+135X22+115X23+120X24+155X31+150X32+140X33+130X34
s.t.
X11+X12+X13+X14 <= 160
X21+X22+X23+X24 <= 160
X31+X32+X33+X34 <= 140
X11+X21+X31 = 180
X12+X22+X32 = 75
X13+X23+X33 = 100
X14+X24+X34 = 85
Xij >= 0
Solution using LINGO is following:
Hours Assigned | Billing | |
Avery-Client A | 0 | 0 |
Avery-Client B | 40 | 5000 |
Avery-Client C | 100 | 11500 |
Avery-Client D | 0 | 0 |
Baker-Client A | 40 | 4800 |
Baker-Client B | 35 | 4725 |
Baker-Client C | 0 | 0 |
Baker-Client D | 85 | 10200 |
Campbell-Client A | 140 | 21700 |
Campbell-Client B | 0 | 0 |
Campbell-Client C | 0 | 0 |
Campbell-Client D | 0 | 0 |
Total Billing = 57,925
c)
A new constraint X12 = 0 is added in the LP model.
Revised model and solution is as follows:
Hours Assigned | Billing | |
Avery-Client A | 0 | 0 |
Avery-Client B | 0 | 0 |
Avery-Client C | 100 | 11500 |
Avery-Client D | 40 | 4000 |
Baker-Client A | 40 | 4800 |
Baker-Client B | 75 | 10125 |
Baker-Client C | 0 | 0 |
Baker-Client D | 45 | 5400 |
Campbell-Client A | 140 | 21700 |
Campbell-Client B | 0 | 0 |
Campbell-Client C | 0 | 0 |
Campbell-Client D | 0 | 0 |
Total billing = 57,525
Problem 10-05 Premier Consulting's two consultants, Avery and Baker, can be scheduled to work for clients up to a...
Problem 10-05 Premier Consulting’s two consultants, Avery and Baker, can be scheduled to work for clients up to a maximum of 160 hours each over the next four weeks. A third consultant, Campbell, has some administrative assignments already planned and is available for clients up to a maximum of 140 hours over the next four weeks. The company has four clients with projects in process. The estimated hourly requirements for each of the clients over the four-week period are as...
c. How much should both red and blue GloFish while man duced at the Texas farm? Premier Consulting's two consultants, Avery and Baker, can be sch clients up to a maximum of 160 hours each over the next four week tant, Campbell, has some administrative assignments already planned clients up to a maximum of 140 hours over the next four weeks. The clients with projects in process. The estimated hourly requirements for eac over the four-week period are as follows:...