Please find attached images for detailed solution.
If any query, please feel free to ask.
Question 4 (30 marks] You have just joined a company named Big Bob's Benzene Bifurcators, a company that designs an...
Question 4 [30 marks] You have just joined a company named Big Bob's Benzene Bifurcators, a company that designs and tests pipe fittings for benzene (CHs) distribution. The company's core business is building pipe fittings that separate a flow from one inlet pipe into two outlet pipes. As part of your training, you've been asked to investigate the following system. The piping system is horizontal, with a feed pipe 3 km long and two outlet pipes 2 km long. The...
Question 1 50 marks Part A (30 marks) In a proposed water supply system, two large reservoirs will be connected with a pipeline 9 km long and with an elevation difference of 72 metres between the full water levels of the reservoirs. The pipe will be required to convey a minimum discharge of 450 L/s. The proposed pipe material is UPVC. Fittings in the pipeline include one 90° short radius elbow and one gate valve fully open. Pipeline entrance and...