The plan view of a typical floor of a four-story heavy storage facility is shown below. The floor and roof live load is 250 p

0 0
Add a comment Improve this question Transcribed image text
Answer #1

A)

Slab thickness=8"

Self weighy of slab=(8/12)*150=100 psf

Super dead Load=10 psf

Live load=250 psf

Factored area load on floor=1.2*(100+10)+1.6*250=532 psf

Tributtary width of typical interior beam=12 ft

Span of typical interior beam=27 ft

Factored load beam from floor=12*532/1000=6.384 kip/ft

Factored weight of beam=1.2*96/1000=0.1152 kip/ft

Total factored iniform load on beam=6.384+0.1152=6.5 kip/ft

Maximum moment in typical interior beam=6.5*27²/8=592.3 kip-ft

Tributray width of typical exterior beam=6 ft

Factored uniform load from floor=6*532/1000=3.192 kip/ft

Total factored load=3.192+0.1152=3.31 kip/ft

Maximum moment in typical exterior beam=3.31*27²/8=301.6 kip-ft

B)

Girders are basically supporting beams in addition to their own weight

For typical interior girder, load is coming from both sides

Factored load on interior girder from each beam=6.5*27/2=87.75 kips

Span of each girder=36 ft

Factired moment in girder due to loads from beams=2*87.75*12=2106 kip-ft

Facored momeent in girder due to its own weight=1.2*0.106*36²/8=21 kip-ft

Total moment in interior girder=2106+21=2127 kip-ft

Typical exterior girder has loads from beams only from one side

Factored moment in girder due to loads from beam=87.75*12=1053 kip-ft

Factored moment in gorder due to its onw weight=21 kip-ft

Total momemt in girder=1053+21=1074 kip-ft

C)

Maximim axial load will be in an interior column since that has maximum tributray area

Tributry area of interir colimn=36*27=972 ft²

Factored load on column from floor=972*532/1000=517 kips

Factored load on column from beam weight=1.2*96*27/1000=3.11 kips

Factored lpad on column from girder weight=1.2*106*36/1000=4.58 kips

Total axial.load=517+3.11+4.58=524.7 kips

Add a comment
Know the answer?
Add Answer to:
The plan view of a typical floor of a four-story heavy storage facility is shown below. The floor and roof live load is...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • is the second floor of a four-story building. a flat Consider the floor framing plan shown...

    is the second floor of a four-story building. a flat Consider the floor framing plan shown below. Thi The design floor live load is 90 psf. The design roof live load is 20 psf. The structure has roof G1 G4 /2 G2 GS 2o G3 FLOOR FRAMING PLAN Assume that the floor between Beams B7 and B8 is supported directly by these two beams only (not by Girders G2 and G3). Beam B7 has a self-weight of 30 plf. The...

  • *please solve ALL questions Assume that the floor between Beams B7 and B8 is supported directly...

    *please solve ALL questions Assume that the floor between Beams B7 and B8 is supported directly by these two beams only (not by Girders G2 and G3). Beam B7 has a self-weight of 30 plf. The floor slab consists of a 4-in.-thick, normal-weight, reinforced concrete slab (unit weight = 150 pcf). An additional floor dead load of 15 psf is specified to account for the weight of suspended utilities and fixtures. As an exterior beam, B7 must also support one...

  • The floor system of school classroom is shown below. Determine the total load acting on all...

    The floor system of school classroom is shown below. Determine the total load acting on all beams, girders, and columns. STEEL COLUMN W16X100 GIRDER 4 INCH CONCRETE SLAB W8X40 BEAM 12 ft 6 ft

  • 1. For the given framing plan, first identify all unique beams and columns. After that, find out the final load tra...

    1. For the given framing plan, first identify all unique beams and columns. After that, find out the final load transferred on each beam and girder. Finally draw load diagrams for all beams and girders, and determine the support reactions. 50 ft 50 ft 50 ft 25 ft I(2 B1 25 ft 3 1 25 ft 4 25 ft A B D Use: Live load 110 PSF ead load excluding weight of the slab Thickness of concrete slab = 5...

  • Assignment #1 A three-story office building, determine the total dead & live loads by columns A1...

    Assignment #1 A three-story office building, determine the total dead & live loads by columns A1 and C3 and beams. The precast exterior wall supported by the perimeter beams weighs 600 lb/ft. The floor system consists of a 6 in-thick reinforced concrete slab. 25 5-0 BEAM -0 12 14 Beam 12" Column Framing Plan

  • 4. A two story office building has interior columns spaced 25 ft apart in two perpendicular...

    4. A two story office building has interior columns spaced 25 ft apart in two perpendicular directions. The columns are fixed at the roof, the second floor and the ground floor in both directions. Consider the dead load (4 inch-thick reinforced concrete slab at the roof and 6 inch thick reinforced concrete slab at the floor) as well as appropriate live load. Ignore other dead weight other than shown. Determine the following using A992 steel: (20 points) 1) Dead load...

  • Seeking structural engineering help. please answer the entire question, showing all steps. thank ...

    seeking structural engineering help. please answer the entire question, showing all steps. thank you very much! The structural steel framing plan of the figure represents a floor system for a narrow commercial building. The floor is to support a 6 in. thick reinforced concrete slab, a live load of 150 psf and an additional future load of 20 psf. Use the Allowable Stress Design (as per the class reference materials) and ASTMA36 steel for all members, use 0.6 Fy as...

  • Refer to the plan view below for a partial roof framing plan of a building (note...

    Refer to the plan view below for a partial roof framing plan of a building (note that this is not to scale, use dimensions indicated). A slope of inch per foot is provided at the roof. The roof trusses are spaced at 32 inches on center and are supported by glu-laminated girders that are supported by wood posts. Determine the following: The roof live load for the roof trusses in terms of pounds per foot along the length of the...

  • A three-story building has a floor layout as shown in Figure 1 with 30 ft bays...

    A three-story building has a floor layout as shown in Figure 1 with 30 ft bays in each direction. It must support a uniform dead load of 90 psf and a uniform live load of 80 psf. For LRFD design, determine the required moment and shear strength for beams and required axial strength for columns indicated below. In the calculations, assume all beams and girders are simply supported. a) The beam marked with #1 if the deck spans from line...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT