Question

You are responsible for the construction of a medium sized inner city building. The foundation material consists of hard, hig
0 0
Add a comment Improve this question Transcribed image text
Answer #1

In the given question, we can clearly say that both buildings have pier footings down to the rock. And there will be no requirement of underplanning. We can complete the task in the following manner.

1.Generally, there are many tools available for excavation of shallow depths. Those are mainly spade, shovel, hoe, trowel and rack etc. These are called hand tools.

2.When coming to the large depths, we can use bulldozers, wheeled excavators, drag line excavators and backhoe excavators. These are called machinery equipment.

3.Initially, we should excavate upto 3 mts. by using one of the machinery equipment which is mentioned in (point 2) .

4.Since the given building area is some how large, it's better to choose the mechinery equipment for excavation. Clean the site to make a proper work. We should remove the waste papers, stones and unnecessary things. Then, the surface should be leveled completely.

5.After that,an equipment called percussion driller is used to make the required holes in the soil strata. This equipment is simply suitable for the given soil type.

6.We have to provide the different type of piers as per the requirements.

7.Mostly, rcc piers can be preferred for the normal buildings.

8.We should provide the proper spacing between each piers by measuring with a metallic tape.

9.This is the main this we've to consider, because we can't change later once we started the work.

10.If we choose helical foundation,then sonotubes can be used at the work of installation of piers.

11.Sonotubes are the metallic spiral duct. We should apply the oil to the inner surface of the sonotube.

12.After digging hole. We should construct the individual footings first. Longitudinal bars also should be extended up to the ground level.

13.Then, we should place the sonotubes which consists the height up to the ground surface.

14.Make the proper concrete mix by using concrete and stone crushers,concrete mixtures or ready mix concrete trucks. Pour the concrete in that hole completely.

15.Then, remove the sonotubes.Now, the piers are at the ground level. Then, provide the longitudinal and transverse reinforcement and make the beams and slab which connects all the piers. This is the one of the best methods to prepare the site for structural foundation work. The type of installation varies from place to place.

Add a comment
Know the answer?
Add Answer to:
You are responsible for the construction of a medium sized inner city building. The foundation material consists of...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • PROBLEMS 1. Figure 9.18 is representative of soil conditions at a construction site. If you are t...

    Please I need help to solve these problems PROBLEMS 1. Figure 9.18 is representative of soil conditions at a construction site. If you are the con- tractor, select a dewatering method you would consider appropriate for each of the projects described below. Consider the information given in this chapter, earlier chapters and any be built and operated. Justify clearly any assumptions you make. Discuss what difficulties other information that may be appropriate. Describe in detail how your sy stem would...

  • can you please answer question 1 and 3 please ABC General Contractors ABC General Contractors was...

    can you please answer question 1 and 3 please ABC General Contractors ABC General Contractors was an established construction company handling small-to medium- sized commercial and industrial construction projects. Some recent projects that the company had completed were a 20,000-square-foot factory building, a four-story office building, and a water filtration plant. TELEVISION TOWER BID The company was now in the process of preparing a bid for a television station for the erection of a 225-foot-high television antenna tower and the...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT