numerical methods 3. An electrical engineer supervises the production of three types of electrical components. Three...
3. An electrical engineer supervises the production of three types of electrical components. Three kinds of material - metal, plastic and rubber - are required for production. The amounts needed to produce each component are: Plastic (g/component) Rubber (g/component) Metal (g/component) component 1 1.0 0.25 15 1.2 0.33 17 2 1.6 0.42 19 3 If totals of 2.12, 0.0434, and 0.164 kilogram of metal, plastic, and rubber, respectively are available each day, how many components can be produced per day? Solve 3 or 4 using any direct method or any iterative method for linear systems with convergence parameter & = 0.001
3. An electrical engineer supervises the production of three types of electrical components. Three kinds of material - metal, plastic and rubber - are required for production. The amounts needed to produce each component are: Plastic (g/component) Rubber (g/component) Metal (g/component) component 1 1.0 0.25 15 1.2 0.33 17 2 1.6 0.42 19 3 If totals of 2.12, 0.0434, and 0.164 kilogram of metal, plastic, and rubber, respectively are available each day, how many components can be produced per day? Solve 3 or 4 using any direct method or any iterative method for linear systems with convergence parameter & = 0.001