a)
b)
Florida A&M 3. (a) Use the "0.45 Power Chart" below to draw the sieve lines for a 19 mm sieve, for a (2...
Construction materials 3. Calculate the percent passing for the sieve analysis shown in table below and plot it on a semi-log gradation chart. What i:s the maximum size? What is the nominal maximum size? (25 points) Sieve Size Amount Cumulative Cumulative Retained, gAmount Percent Passing Percent Retained Retained, g 25 mm (1 in) 9.5 mm (3/8 in) 4.75 mm (No 4) 2.00 mm (No 10) 0.425 mm (No 40) 0.075 mm (No 200 47.1 239.4 176.5 92.7 73.5 9.6 an
24. (Total of 20 pts) Giving aggregate with the following gradation Size, SI Unit (mm) 9.5 4.75 2.36 2 1.18 0.6 0.3 0.15 0.075 Pan Size, English unit 3/8" #4 #8 #10 #16 #30 #50 #100 #200 Pan Amount Retained (g) 0 0 28 35 70 101 35 36 26 10 Cumulative Amount Retained 0 0 28 63 133 234 305 331 341 (g) Cumulative Percent Retained O O 8 18 39 69 89 97.1 100 Percentage Passing 100 100...
The gradations of the two different aggregates (Aggregates A and B) are shown below: 4.75 9.5 75 Size (mm) 19 12.5 2.36 50 20 0.6 40 12 0.3 28 8 0.15 0.075 Aggregate A100 Aggregate B 100 92 % finer 35 2 If the two aggregates are mixed by a weight ratio of 3:1 (Aggregate A:B-3:1), what is the resulted passing percentage for the size 4.75 mm for the mixed aggregate? OB, 67% OC. 52% OD. A. 5896 43% The...
problem 3-1 please answer inside the chart. Draw + Design Layout References View Mailings Review Help Awigancats 160 44 6 50 145 20 165 192 Comprehensive Problems Neto e Chapter 3 Honorkadets below to solve problems 3/ how 3.3. Extreme Edge, Inc Income Sun For the Years Hinded December 31, 2013, 2012 and 2011 (5 in thousands) Accounts payable Accueities Total current liabilities Long-term has Notes payable Total Liabilities 100 350 100 265 100 40 50 410 2011 2013 51.340...