From the options below, please select three options that are part of manufacturing operations systems



From the options below, please select three options that are part of manufacturing operations systems 

  • Material handing system 

  • Automated inspection system 

  • MPR 11 and ERP 

  • FMS cell 

  • Industrial robot 

  • Computerized order 

1 0
Add a comment Improve this question Transcribed image text
Answer #1

Manufacturing operations systems are

MRP ll and ERP

FMS cell

Industrial robot

MRP II and ERP is the process in which the industry can be manufactured,managing and integrates the major parts of business.

FMS cell is the highly automated group in which the machine and process can be merge as cell and do the operation and planning.

Industrial robot is used to manufacturing the operation. It can be use for material handling, process and assembly of the object.

In automated inspection system that can be the part of the MRP II and ERP and so that can not be include.in computerized order that is not work as the manufacturing operations.

Add a comment
Know the answer?
Add Answer to:
From the options below, please select three options that are part of manufacturing operations systems
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • FLEXIBLE MANUFACTURING SYSTEM (FMS)

    A semi-automated flexible manufacturing cell (FMC) is used to produce threeproducts. The products are made by two automated processing stations followedby an assembly station. There is also a load/unload station. Material handlingbetween stations in the FMC is accomplished by automated guided vehicles(AGVs) that move tote bins containing the particular components to beprocessed and then assembled into a given product. The AGVs transfer tote binsbetween stations. In this way, the AGVs are kept busy while tote bins arequeued in front of...

  • From the options listed below, select all that appropriately apply to polar bodies. Question 3 options:...

    From the options listed below, select all that appropriately apply to polar bodies. Question 3 options: A) are cells produced in the process of oogenesis B) are produced only during the first meiotic cell division during sperm production C) are produced only during the second meiotic cell division during sperm production D) are produced during each of the 2 meiotic divisions during egg production E) receive 1/2 of the genetic material of the 'parent' cell they are derived from, but...

  • Question 23 From the following list select three benefits of using Computer Integrated Systems: CLO-1 lower total cost shorter time to market with new products increase in manufacturing productivity...

    Question 23 From the following list select three benefits of using Computer Integrated Systems: CLO-1 lower total cost shorter time to market with new products increase in manufacturing productivity extended inventory level increase in work-in process inventory increase customer lead time Question 23 From the following list select three benefits of using Computer Integrated Systems: CLO-1 lower total cost shorter time to market with new products increase in manufacturing productivity extended inventory level increase in work-in process inventory increase customer...

  • 1. the options are the same for the second part please answer all three, will give...

    1. the options are the same for the second part please answer all three, will give thumbs up Part 3 of Lab 9 has you measure the magnetic field as a function of distance from a long, straight, current-carrying wire. How do you plot the data to show a linear relationship between magnetic field strength and distance? B = magnetic field d = distance Plot (Select) on the horizontal axis. Plot [Select] + on the vertical axis. orizontal axis. rtical...

  • Hart Manufacturing makes three products. Each product requires manufacturing operations in three ...

    Hart Manufacturing makes three products. Each product requires manufacturing operations in three departments: A, B, and C. The labor-hour requirements, by department, are as follows: Department Product 1 Product 2 Product 3 A 2.00 1.50 3.00 B 2.50 2.00 1.00 C 0.25 0.25 0.25 During the next production period the labor-hours available are 450 in department A, 350 in department B, and 50 in department C. The profit contributions per unit are $30 for product 1, $25 for product 2,...

  • 3. What are the advantages and disadvantages of the various options that Amelectserv is evaluating ERP...

    3. What are the advantages and disadvantages of the various options that Amelectserv is evaluating ERP IMPLEMENTATION COSTS Berp Corporation: ON Premise Macrosoft ON Premise 4718 4719 Macrosoft Cloud 4.718 2080 1575 2 DOO 2250 2.250 2980 none none 1675 none 349 10.200 InitialHardware Network Costs Workstations UPS for Werkstations Laptops Server Back Server Server UPS Systems Router Network Infrastrutture set-up Total Ongoing Hardware Network Costs Hardware Maintenance Router Maintenance Network in structure Maintance 2MBPS internet line Totalt year) Total...

  • Wixis Cabinets makes custom wooden cabinets for high-end stereo systems from specialty woods. The company uses...

    Wixis Cabinets makes custom wooden cabinets for high-end stereo systems from specialty woods. The company uses a job-order costing system. The capacity of the plant is determined by the capacity of its constraint, which is time on the automated bandsaw that makes finely beveled cuts in wood according to the preprogrammed specifications of each cabinet. The bandsaw can operate up to 181 hours per month. The estimated total manufacturing overhead cost at capacity is $14,842 per month. The company bases...

  • PLEASE CIRCLE the ANSWERS an desperate the answers from the work. Thank you! O SYSTEMS OF...

    PLEASE CIRCLE the ANSWERS an desperate the answers from the work. Thank you! O SYSTEMS OF EQUATIONS AND MATR. Identifying the operations used to create equivalent syst... Consider the following three systems of linear equations. System A 2x+6y=-18 [A1] 1 -6x - 7y=10 [42] System B System C 2x+6y=-18 [B1] 2x+6y=-18 [C1] 11y=-44 [B2] 1 y=-4 [02] Answer the questions below. For each, choose the transformation and then fill in the blank with the correct number. The arrow ) means...

  • Wixis Cabinets makes custom wooden cabinets for high-end stereo systems from specialty woods. The company uses...

    Wixis Cabinets makes custom wooden cabinets for high-end stereo systems from specialty woods. The company uses a job-order costing system. The capacity of the plant is determined by the capacity of its constraint, which is time on the automated bandsaw that makes finely beveled cuts in wood according to the preprogrammed specifications of each cabinet. The bandsaw can operate up to 187 hours per month. The estimated total manufacturing overhead cost at capacity is $15,147 per month. The company bases...

  • please solve for part a from figure below. show answers clearly and will upvote if correct...

    please solve for part a from figure below. show answers clearly and will upvote if correct figure. part a Consider the pulley system shown in (Figure 1) Figure 1 of 1 8D B Part A Determine the magnitude of the force P required to hold the 150-lb weight in equilibrium. answer to three significant figures and include the appropriate units. Express your 1 ? μΑ Units Value P =

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT