If the switchgrass field is 50 acres and use the same windrower, it will need 4.91 hours to complete this entire field based on its theoretical capacity. Considering the 16% capacity loss, after 4.91 hours of operation, there will be 50×16% = 8 ac field left. How much time will be needed to finish these 8 acres?

0 0
Add a comment Improve this question Transcribed image text
Answer #1

50 gexd/ hous Gpaily 4.9 af fex 16 Iare of cspacily now capacity s SO 4.91 SOX84 1 4.91160 4-9 4.91 acred ime needed to tinis

Add a comment
Know the answer?
Add Answer to:
If the switchgrass field is 50 acres and use the same windrower, it will need 4.91...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 02 Consuelo Chua, Inc., is a disk drive manufacturer in need of an aggregate plan for...

    02 Consuelo Chua, Inc., is a disk drive manufacturer in need of an aggregate plan for July through December. The com- pany has gathered the following data: COSTS Holding cost $8/disk/month Subcontracting 580/disk Regular-time labor $12 hour Overtime labor $18 hour for hours above 8 hours/workerday Hiring cost $4000/ worker Layoff cost $8000/worker DEMAND Note: In this problem (and Q3) the production cost should be computed based on the labor cost OTHER DATA Current worden 8 people Labor hours disk...

  • The grocery store we use does not mark prices on its goods. My wife went to...

    The grocery store we use does not mark prices on its goods. My wife went to this store, bought three packages of bacon and two cartons of eggs, and paid a total of $11.35. Not knowing that she went to the store, I also went to the same store, purchased two packages of bacon and three cartons of eggs, and paid a total of $9.55. Now we want to return two packages of bacon and two cartons of eggs. How...

  • A business wants to reduce its energy use. One option is to replace ten existing 50...

    A business wants to reduce its energy use. One option is to replace ten existing 50 watt fluorescent lights with ten new, 8 watt LED lights that provide the same amount and quality of lighting. The lights are used 12 hours per day, 250 days per year. The cost of electricity is $0.2/kWh. Each LED light costs $1 Assume the new lights last 10 years and that the time frame of the analysis is 10 years. Assume that the electricity...

  • How do I use Excel Solver to solve this problem? I need a step by step...

    How do I use Excel Solver to solve this problem? I need a step by step process please. The famous YS Chang restaurant is open 24 hours a day. Waiters and busboys report for duty at 3am, 7am, 11am, 3pm, 7pm, or 11pm, and each works an 8 hour shift. The following table shows the minimum number of workers needed during the six periods into which the day is divided. Chang's scheduling problem is to determine how many waiters and...

  • Hi, PLEASE I need the code in C programming, (USING THE SAME INPUT AND OUTPUT FORMAT...

    Hi, PLEASE I need the code in C programming, (USING THE SAME INPUT AND OUTPUT FORMAT DESCRIBED BELOW). Title: Game of Life Description In this assignment, you will code a simulation called "Game of Life". It is a very famous 'game' and the formed the basis of an entire field of simulation models called "cellular automata". Before continuing reading this assignment, I suggest you read a bit more about Game of Life at: https://en.wikipedia.org/wiki/Conway's_Game_of_Life or http://www.math.com/students/wonders/life/life.html (the latter also has...

  • Please i need a good answer and a perfect answer.. i need unique answer use your own words. pleas...

    please i need a good answer and a perfect answer.. i need unique answer use your own words. please i need a good answer and a perfect answer.. i need unique answer use your own words. please i need a good answer and a perfect answer.. i need unique answer use your own words. don't use handwriting Q3: a) Specify the two factors used to determine the capacity of memory. Find out the memory capacity, if the number of bits...

  • Civen folliving resoures, a hardware manufacturer makes 2,000 units of one product every day 50 hours...

    Civen folliving resoures, a hardware manufacturer makes 2,000 units of one product every day 50 hours per day, $30 per hour Labor Material 100 pounds per day, $10 per pound Capital $2,000 per day Energy s500 per day Please answer the following questions, based on this information. Please note each question is independent 5. What is the material productivity (in unit'S) for the manufacturer? (a) 0.5 (c) 2 (d) 20 (e) 200 6. How many pounds of materials are needed...

  • Instructions: 1. For cell D16 you need to use Vlookup it is based on the job...

    Instructions: 1. For cell D16 you need to use Vlookup it is based on the job title of each employee. (3 columns in the table below) 2. Naming a range: the yellow cells in the table below-cells B31:236 should be named "Rate" 3. Use the range named Rate in your vookup D16 and copy the vookup till cell D23 4. Use an IF calculations for over 40 hours, time and half pay in E15. Copy your if down till cell...

  • Portsmouth Company makes upholstered furniture. Its only variable cost is direct materials. The demand for the...

    Portsmouth Company makes upholstered furniture. Its only variable cost is direct materials. The demand for the company's products for exceeds its manufacturing capacity. The bottleneck (or constraint) in the production process is upholstery labor-hours. Information concerning three of Portsmouth's upholstered chairs appears below. Selling price per unit Variable cost per unit Upholstery Labor-hours per unit Recliner $ 1,198 $ 750 8 hours $ $ Sofa 1,855 1.250 11 hours Love Seat $ 1,380 $ 900 6 hours Required: 1. Portsmouth...

  • need help with number 2 HW #3 for Chem 318 Due: April 29, 2019 1. Solute A has a K 2.5 for an extraction between water (phase 1) and chloroform (phase 2). If 100 mL of a 0.01 fraction will be extr...

    need help with number 2 HW #3 for Chem 318 Due: April 29, 2019 1. Solute A has a K 2.5 for an extraction between water (phase 1) and chloroform (phase 2). If 100 mL of a 0.01 fraction will be extracted? For the same solute and, what fraction will be extracted if 5 extractions wi 80 mL chloroform each are used (instead of one 400 ml extraction)? M solution containing solute A in water is extracted one time with...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT