Answer : $500
Calculated as
Cost per order using ABC is
Cost allocated = $12500 on basis of order
Total orders = 15+10 = 25
Cost per order = $12500/25 = $500
Hit Thumbs up if satisfied
For any query mention in comment section please
Thank you
16) Figure 4-11 Longview Manufacturing Company manufactures two products (I and II), The overhead costs ($58,000)...
9. Heather Manufacturing Company manufactures two products (I and II). The overhead costs (536,200) have been divided into three cost pools that use the following activity drivers: Number of Labor Product Number of Orders Transactions Labor Hours 290 125 1,250 Cost per pool $10.200 $6,000 $20,000 12 35 What is the allocation rate per labor transaction using activity-based costing (ABC) system? (Round the answer to two decimal places.) a $75.55 b. $68.97 c. $291.43 d. $37.50
& Tandem Company manufactures to products (D and F). The overhead costs (584,000) have been divided into three cost pools that use the following activity drivers Product Number of Setups Machine Hours Packing Orders SOO 175 10 2,000 10 Cost per pool 511,000 560,000 $18.750 What is the allocation rate per packing order using activity based costing? a $18,750 b. 575 c. $ 1,875 d. S 250 HD The overhead costs ($36.200)
8. Tandem Company manufactures two products (D and F. ompany manufactures two products (D and F). The overhead costs ($84.000) have divided into three cost pools that use the following activity an Product Number of Setups Machine Hours Packing Orders 500 10 2.000 175 10 75 Cost per pool $11,000 $60,000 $18.750 What is the allocation rate per packing order using activity-based costing? a. $18,750 b. $ 75 c. $ 1.875 d. $ 250
The Leon Company manufactures Bows and Ties. The following shows the activities per product and total activity information: Setups Inspections Assembly (DLH) Bows - 4,000 units 1 4 1 Activity Pool Budgeted Amount Activity Base Setups $60,000 20,000 Inspections $120,000 124.000 Assembly (DL Hrs) $420,000 28,000 Calculate the total factory overhead to be charged to each unit of Bows. Multiple Choice $16.67 $23.00 the total factory overhead to be charged to each unit of Bows. Multiple Choice $16.67 $23.00 $50.00...
Exercise 4-5 Assigning Overhead to Products in ABC [LO4-2, L04-3) Sultan Company uses an activity-based costing system At the beginning of the year, the company made the following estimates of cost and activity for its five activity cost pools: Activity Cost Pool Labor-related Purchase orders Parts management Board etching General factory Activity Measure Direct labor-hours Number of orders Number of part types Number of boards Machine-hours Expected Overhead Cost $311,500 $ 8,840 $ 71,280 $ 63,700 $ 148,eee Expected Activity...
Hakara Company has been using direct labor costs as the basis for assigning overhead to its many products. Under this allocation system, product A has been assigned overhead of $10.80 per unit, while product B has been assigned $3.60 per unit. Management feels that an ABC system will provide a more accurate allocation of the overhead costs and has collected the following cost pool and cost driver information: Cost Pools Machine setup Materials handling Electric power Activity Costs Cost Drivers...
Hakara Company has been using direct labor costs as the basis for assigning overhead to its many products. Under this allocation system, product A has been assigned overhead of $22.86 per unit, while product B has been assigned $7.39 per unit. Management feels that an ABC system will provide a more accurate allocation of the overhead costs and has collected the following cost pool and cost driver information: Cost Pools Activity Costs Cost Drivers Activity Driver Consumption Machine setup $...
Hakara Company has been using direct labor costs as the basis for assigning overhead to its many products. Under this allocation system, product A has been assigned overhead of $27.90 per unit, while product B has been assigned $11.78 per unit. Management feels that an ABC system will provide a more accurate allocation of the overhead costs and has collected the following cost pool and cost driver information: Cost Pools Machine setup Materials handling Electric power Activity Costs Cost Drivers...
National manufactures two products, A#4 and B#3. The company expects to produce and sell 3,200 units of A#4 and 2,100 units of B#3 during the year. National uses activity based costing to compute overhead costs per product. Data relating to the company's three activity cost pools are given below for the current year: Direct Materials Direct Labor A4 $36.50 $28.30 B#3 $46.50 $57.90 Activity Cost Pool Machine Setups Purchase orders General Factory Estimated Expected Activity Overhead Costs A#4 B#3 $4,680...
Buoys and Gulls Corp manufactures three types of model boat. It is estimated that the following activity will take place during 2014: Product Direct material cost per unit ($) Direct labor cost per unit ($) Total output of each product (in units) Machine hours worked (per unit) Total machine hours worked A 100 80 1,000 1 ? B 60 70 2,000 2 ? C 60 40 5,000 7 ? Fixed manufacturing overheads for the period are estimated at $1,400,000. Overheads...