Question

A construction firm is currently working on two different buildings. Let denote the event that the ith building is completed by the contract date. Use the operations of union, intersection, and complementation to describe each of the following events in terms of A1 and A2and draw a Venn diagram, and shade the region corresponding to each one. 1. At least one building is completed by the contract date Both buildings are completed by the contract date Only the first building is completed by the contract date Exactly one building is completed by the contract date a. b. c. d.

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Solution for sub-part of a) and b) :-

Solution A 1 Event ot buildling 1 Completed b Conthect date A2 Event of buildin4 2 completed b conat date. S Sample Space Cset ot ai possible outcomes) a.→RE Least one bu iclind ls completed ba the Contract date. A1 UA2 event hat at least me building is completed b Contiact date. b. → Both bui dings emnec iCompleted by Conthact date A1nA2 event that both buildings contna t date. one completed 5 A venn dianam C 。te :-Sha dedaegion叼represents th e desired event)

Solution for sub-part of c) and d) :-

C, → Onlǎ fiast bui bling IS completed 6J the conthat olate A1 nA - event A1 excludling A2 2 venn cianam d→ Exactly one buildanats completed b the Contact date Hene we ave too b uildiną s So aue OD ent (A1 excluoling AA excluoing A. excluding Ao) 2 Venn dliu Note Shuded region repnesents he desired event)

Add a comment
Know the answer?
Add Answer to:
A construction firm is currently working on two different buildings. Let denote the event that the...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • An engineering construction firm is currently working on power plants at three different sites. Let A,...

    An engineering construction firm is currently working on power plants at three different sites. Let A, denote the event that the plant at site i is completed by the contract date. Use the operations of union, intersec- tion, and complementation to describe each of the following events in terms of A1, A2, and A3, draw a Venn diagram, and shade the region corresponding to each one. a. At least one plant is completed by the contract 8. , date. b....

  • 1. A coustruction firm is working ou two different projects. Let A be the event that...

    1. A coustruction firm is working ou two different projects. Let A be the event that the first one is completed by the contract date and defined B atualogously for the second project. (a) Explain the events AUB and An B in words (b) II P(AUB)-0.9 and P(AnB) -0.5, what is the probability that exactly one (Le. not both) is completed by the contract date? Hint: Draw a Venn diagram.)

  • Problem 1.1 Let A, B, C be three events in a sample space S. Each of...

    Problem 1.1 Let A, B, C be three events in a sample space S. Each of the statements below describes an event built from events A, B, and C. For each statement, express the resulting event in terms of the events A, B, and C using only the complement, union, and intersection operations. Also, for each statement, draw an appropriate Venn diagram and shade the resulting event. (There may be several ways to write the same statement, you only need...

  • Problem 1.1 Let A, B, C be three events in a sample space S. Each of...

    Problem 1.1 Let A, B, C be three events in a sample space S. Each of the statements belovw describes an event built from events A, B, and C. For each statement, express the resulting event in terms of the events A, B, and C using only the complement, union, and intersection operations. Also, for cach statement, draw an appropriate Venn diagram and shade the resulting event. (There may be several ways to write the same statement, you only need...

  • A construction firm bids on two different contracts. Let E1 be the event that the bid...

    A construction firm bids on two different contracts. Let E1 be the event that the bid on the first contract is successful, and define E2 analogously for the second contract. Suppose that P(E1) = 0.6 and P(E2) = 0.3 and that E1 and E2 are independent events. (a) Calculate the probability that both bids are successful (the probability of the event E1 and E2). (b) Calculate the probability that neither bid is successful (the probability of the event (not E1)...

  • 2. Express each of the following events in terms of the events A, B, and C,...

    2. Express each of the following events in terms of the events A, B, and C, and the operations of complementation, union, and intersection: (a) at least one of the events A, B,C occurs; (b) at most one of the events A, B, C occurs; (c) none of the events A, B, C occurs; (d) all three events A, B, C occur (e) exactly one of the events A, B, C occurs; (f) events A and B occur, but not...

  • Question 1: What is a joint venture and why might two construction firms choose to form...

    Question 1: What is a joint venture and why might two construction firms choose to form one? (4 points) Case Study 1: Please answer the first 4 questions with the following case data for Project 101 and Project 102. A construction company began operations on January 2, 2010. During the year the company was awarded three construction contracts. The company incurred $300,000 operating expenses for the year for which $275,000 has been paid while the balance is owed as of...

  • TORENTO CONSTRUCTION: ETHICAL CONTRACTING On December 27, 2010, Cary Holmes, manager of the Supply Chain Management...

    TORENTO CONSTRUCTION: ETHICAL CONTRACTING On December 27, 2010, Cary Holmes, manager of the Supply Chain Management (SCM) group at Torento Construction Inc. (NCG), was in his office in Torento, Ontario, trying to organize the thoughts running through his head as a result of a recent bidding to save operating costs at NCG. There was no problem in terms of the final outcome; in fact, the bid was going to result in cost savings of 25 per cent, which was exactly...

  • Excercise 3-1,3-2,3-8 On June 1, Campbell Corpua in the amount of $50,000. Using the formats sho...

    Excercise 3-1,3-2,3-8 On June 1, Campbell Corpua in the amount of $50,000. Using the formats sho to record this transaction in a general journal and pos accounts. The entry will be recorded on page 7 of the general journal. Use what numbers you like in the general ledger. Assume that none of the accounts to be debited ost it to the appiupiaie geheral whatever a If at a later date, you wanted to review this transaction, would you examine ledger...

  • Henrietta’s Pine Bakery Background You are an Analyst for the professional service firm, FINACC LLP. Your...

    Henrietta’s Pine Bakery Background You are an Analyst for the professional service firm, FINACC LLP. Your firm specializes in providing a wide variety of internal business solutions for different clients. Given the outstanding feedback you received on your first engagement working for Big Spenders Inc., a Senior Manager in the Financial Advisory group requested your support on a compilation engagement. Additional Information Henrietta’s was established in 1963 when it first opened its doors in Dwight, Muskoka on highway 60. Over...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT