Design a pretreatment lime stabilization system for Quirm. The daily sludge flow rate of 112 m3 is to be treated in one batch. The primary sludge has a solids concentration of 6% and a specific gravity of 1.02. Determine the volume of tank, mixer size (kW, rpm, turbine dia.), lime feed rate, and lime storage volume for two-week delivery.
We need at least 10 more requests to produce the solution.
0 / 10 have requested this problem solution
The more requests, the faster the answer.