Manufacturing Cost The weekly production cost C of manufacturing x watches is given by the formula
C = 4000 + 2x, where the variable C is in dollars.
(a) What is the cost of producing 1000 watches?
(b) What is the cost of producing 2000 watches?
We need at least 10 more requests to produce the solution.
0 / 10 have requested this problem solution
The more requests, the faster the answer.