The 2-Mg concrete pipe has a center of mass at point the average normal stress developed in the cables. The diameters of AB and AC are 12 mm and 10 mm, respectively.
We need at least 10 more requests to produce the solution.
0 / 10 have requested this problem solution
The more requests, the faster the answer.