The anchorage of the bottom track of a load-bearing CFS wall to the concrete footing
a. requires 6-in.-long stud material to strengthen the connection.
b.requires 6-in.-long additional track material to strengthen the connection.
c.requires a 6-in.-long cold-formed furring section to strengthen the connection.
d.requires no additional strengthening.