An industrial storage site was located near the ridge in Problem 9.9 and has contaminated the aquifer. To prevent the contaminated groundwater from reaching the stream, a line (parallel to the stream) of pumped wells will be installed between the ridge and the stream. Pump tests indicate that each well will produce 0.032 bps (0.5 gpm). Compute the maximum spacing of the wells to capture the contaminated groundwater.
We need at least 10 more requests to produce the solution.
0 / 10 have requested this problem solution
The more requests, the faster the answer.