C contracted with architect D to design the structural work of the latter’s school project. However, the job was delayed by the city because of financing. The project was finally cleared, but before C started any of D’s work, C obtained two other large jobs. He telephoned D and explained that he now had all the work that he could handle, and he asked D to get someone else. Can D hold C to his bargain?