Figure shows a proposed foundation site, with 10 ft of sand overlying 15 ft of clay with consolidation properties shown. The clay is normally consolidated. Assume 1-D conditions.

(a) Compute the initial σ’u at the middle of the clay layer prior to excavation and construction.


(b) After excavation and during construction, the foundation area will be heavily loaded with the structure and equipment so that σ’u at the middle of the clay layer will be increased to 3900 psf. Determine the settlement that will occur under these conditions.


(c) After construction is completed, the equipment will be removed, and the final σ’u at the middle of the clay layer will be 3200 psf.

As part of your answer, please be sure to sketch the compression curve followed in parts (b) and (c).

Step-by-Step Solution

Request Professional Solution

Request Solution!

We need at least 10 more requests to produce the solution.

0 / 10 have requested this problem solution

The more requests, the faster the answer.

Request! (Login Required)


All students who have requested the solution will be notified once they are available.
Add your Solution
Textbook Solutions and Answers Search
Solutions For Problems in Chapter 10