The borrow material to construct an embankment has a dry unit weight of 86.2 pcf and a water content of 5%. The specific gravity of the solids is 2.64. The contract specifications require that the soil be placed in the fill at a γd of 115 pcf and a water content of 8%. How many cubic yards of borrow are required to construct an embankment having a 65,000-cy net volume? (86,717 bcy)
We need at least 10 more requests to produce the solution.
0 / 10 have requested this problem solution
The more requests, the faster the answer.