Rework Example from the case study on Jones Creek for Subbasin C (see PowerPoint on textbook website). The baseflow for Subbasin C is 200 cfs. In addition, the initial infiltration for the first hour is 1 in and a constant infiltration of 0.5 in thereafter. The storm hydrograph and rainfall hyetograph for Subbasin C are given in Figures a and b.
Example
Figure a
Figure b
We need at least 10 more requests to produce the solution.
0 / 10 have requested this problem solution
The more requests, the faster the answer.