This problem demonstrates that although Equation (10.2) for rate monotonic scheduling is a sufficient condition for successful scheduling, it is not a necessary condition (i.e., something successful scheduling is possible even if Equation (10.2) is not satisfied).
a. Consider a task set with the following independent periodic tasks:
w•Task P1:C1 = 20; T1 = 100
•Task P2:C2 = 30; T2 = 145
Can these tasks be successfully scheduled using rate monotonic scheduling?
b. Now add the following task to the set:
•Task P3:C3 = 68; T3 = 150
Is Equation (10.2) satisfied?
c. Suppose that the first instance of the preceding three tasks arrives at time. Assume that the first deadline for each task is the following:
D1 = 100; D2 = 145; D3 = 150
Using rate monotonic scheduling will all three deadlines be met? What about deadlines for future repetitions of each task?
We need at least 10 more requests to produce the solution.
0 / 10 have requested this problem solution
The more requests, the faster the answer.