During which of the five SDLC stages is each task, labeled (a) through (m), performed? More than one answer may apply for each activity.
___ 1. Systems analysis | a. Writing operating procedure manuals |
___ 2. Conceptual (general) systems design | b. Developing program and process controls |
___ 3. Physical (detailed) systems design | c. Identifying alternative systems designs |
___ 4. Implementation and conversion | d. Developing a logical model of the system |
___ 5. Operation and maintenance | e. Identifying external and administrative controls |
f. Testing the system | |
g. Training personnel | |
h. Evaluating the existing system | |
i. Analyzing the achievement of systems benefits | |
j. Modifying and altering programs | |
k. Analyzing total quality management (TQM) performance measures | |
l. Conducting a feasibility analysis | |
m. Aligning AIS development plans with business objectives |
We need at least 10 more requests to produce the solution.
0 / 10 have requested this problem solution
The more requests, the faster the answer.